Plan Routing

Plans listed as rejected need to be amended / modified and submitted for further review.

Address Project Title Description Project Date Eng. Fire Plan. Hlth. Status
1421 8 Ave N  8th Ave Rowhouse Building 2  **Resubmittal of civil drawings 3.26.15 JDS**
**new site plan submitted 01-30-15
Construct a 5 unit rowhouse 
P1421.01.15.15 3/26/2015  PendingApproved
3/27/2015
PendingN/A Review I-P
1421 8 Ave N  8th Ave Rowhouse Building 2  **new site plan submitted 01-30-15
Construct a 5 unit rowhouse 
P1421.01.15.15 1/30/2015  PendingApproved
1/30/2015
Approved
3/12/2015
N/A Superseded
1421 8 Ave N  8th Ave Rowhouse Building 2  Construct a 5 unit rowhouse  P1421.01.15.15 1/15/2015  Pending
1/30/2015
Approved
1/19/2015
Pending
1/26/2015
N/A Superseded
813 Barrett St N   8th Ave Rowhouse Building 3  **Resubmittal of civil drawings 3.26.15 JDS**
**New Address, formerly 1417 8 Ave N**
**new site plan submitted 01-30-15
Construct a 5 unit rowhouse 
P1417.01.15.15 3/26/2015  PendingApproved
3/27/2015
PendingN/A Review I-P
813 Barrett St N   8th Ave Rowhouse Building 3  **New Address, formerly 1417 8 Ave N**
**new site plan submitted 01-30-15
Construct a 5 unit rowhouse 
P1417.01.15.15 1/30/2015  PendingApproved
1/30/2015
Approved
3/12/2015
N/A Superseded
813 Barrett St N  8th Ave Rowhouse Building 3  **Address formerly 1417 8 Ave N**
Construct a 5 unit rowhouse 
P1417.01.15.15 1/15/2015  Pending
1/30/2015
Approved
1/19/2015
Pending
1/26/2015
N/A Superseded
1022 15 St N  15 St Rowhouse  **Resubmittal of civil drawings 3.26.15 JDS**
**Resubmittal of Civil Drawing**
Construct 2 rowhouse style buildings with 6 units in each building 
P1022.12.18.14 3/26/2015  PendingApproved
3/27/2015
PendingN/A Review I-P
1022 15 St N  15 St Rowhouse  **Resubmittal of Civil Drawing**
Construct 2 rowhouse style buildings with 6 units in each building 
P1022.12.18.14 2/18/2015  Pending
3/23/2015
Approved
2/19/2015
Pending
3/20/2015
N/A Superseded
1022 15 St N  15 St Rowhouse  Construct 2 rowhouse style buildings with 6 units in each building  P1022.12.18.14 12/18/2014  Pending
12/23/2014
Approved
12/22/2014
PendingN/A Superseded
801 Barrett St N  8th Ave Rowhouse Building 1  **Resubmittal of civil drawings 3.26.15 JDS**
** 8 plex has been redesigned 3.3.15**
**new site plan submitted 01-30-15
Construct an 8 unit row house.  
P801.01.15.15 3/26/2015  Pending
3/26/2015
Approved
3/27/2015
PendingN/A Review I-P
801 Barrett St N  8th Ave Rowhouse Building 1  ** 8 plex has been redesigned 3.3.15**
**new site plan submitted 01-30-15
Construct an 8 unit row house.  
P801.01.15.15 3/3/2015  PendingApproved
3/3/2015
Approved
3/12/2015
N/A Superseded
801 Barrett St N  8th Ave Rowhouse Building 1  **new site plan submitted 01-30-15
Construct an 8 unit row house.  
P801.01.15.15 1/30/2015  PendingApproved
1/30/2015
PendingN/A Superseded
801 Barrett St N  8th Ave Rowhouse Building 1  Construct an 8 unit row house.   P801.01.15.15 1/15/2015  Pending
1/30/2015
Approved
1/19/2015
Pending
1/26/2015
N/A Superseded
1340 Bolley Dr N  NDSU Steven's Hall Accessible Entrance  Construct an addition for a new accessible entrance to Stevens Hall. Upgrade exisiting freight elevator to a passenger function.Upgrade mechanical and electrical as required.  P1340.3.26.15 3/26/2015  Approved
3/26/2015
Approved
3/27/2015
PendingN/A Ready
W-SignOffs
1800 University Dr N  Verizon Wireless (VZW)  Construct the external sector antenna addition at the FargoDome. Antennas are roof mounted and appear to not extend higher than the roof. Conditional use permit for this addition was approved by the Fargo Plan Comission on 3/3/15.  P1800.3.26.15 3/26/2015  N/AN/AN/AN/A Rvwd W-R
1203 28 St S  Chiropractic Enterprises  Construct new office building for chiropractic and massage.  P1203.3.25.15 3/25/2015  Pending
3/27/2015
Approved
3/27/2015
PendingN/A NEW
4401 12 Ave N  Valley Landscaping  **Resubmittal of site plan and civil to show removal of the West approach 3.24.15 JDS**
**Revised Civil (Utilities), added sidewalk (note: West approach is existing - Exit Only) 3.12.15 JS **
Construct a pre-engineered building used for an office, show room and warehouse facility. 
P4401.2.25.15 3/24/2015  Approved
3/26/2015
Approved
3/25/2015
PendingN/A Rvw Resp
Rcvd
4401 12 Ave N  Valley Landscaping  **Revised Civil (Utilities), added sidewalk (note: West approach is existing - Exit Only) 3.12.15 JS **
Construct a pre-engineered building used for an office, show room and warehouse facility. 
P4401.2.25.15 3/12/2015  Pending
3/23/2015
Approved
3/16/2015
Pending
3/19/2015
N/A Superseded
4401 12 Ave N  Valley Landscaping  Construct a pre-engineered building used for an office, show room and warehouse facility.  P4401.2.25.15 2/25/2015  Pending
3/3/2015
Approved
3/2/2015
Pending
3/5/2015
N/A Superseded
1510 12 Ave N  NDSU Demo for Parking Lot  Demo existing building for a new 6" thick concrete parking lot. Site work as necessary.  P1510.3.24.15 3/24/2015  Approved
3/26/2015
Approved
3/25/2015
PendingN/A Ready
W-SignOffs
1033 45 St S  Kroll's Diner  Replace suspended ceiling in various areas as indicated on sheet E.1. Install and replace items noted on Building Cut Sheet E.2. Install items using method and materials indicated on other sheets E.3 to E.9. See sheet and product info E.1 to E.9.  P1033.3.24.15 3/24/2015  N/AN/AN/A Approved
3/25/2015
NEW
619 7 St N  Narthex Remodel (St. Mary's Cathedral)  Gut existing and update lighting, reroute HVAC, sprinkler and door security.  P619.3.24.15 3/24/2015  N/AN/APendingN/A Ready
W-SignOffs
5000 Prosperity Way S  The Aspens at Timber Creek by Heritage Homes  **new site plan submitted.03-24-15
Site work and infrastructure for a private drive for future townhomes 
P5000.10.28.14 3/24/2015  Pending
3/26/2015
Approved
3/25/2015
PendingN/A No Permit
Required
5000 Prosperity Way S  The Aspens at Timber Creek by Heritage Homes  Site work and infrastructure for a private drive for future townhomes  P5000.10.28.14 10/28/2014  Pending
11/6/2014
Pending
10/30/2014
PendingN/A Superseded
3902 13 Ave S LS 804  Johnny Rockets  Interior remodel of existing lease space within West Acres food court for Johnny Rockets restaurant.  P3902.3.23.15 3/23/2015  N/AN/AN/A Approved
3/26/2015
NEW
2120 9 St S  Lincoln Elementary Portable Classrooms  Install 2 portable classrooms. (one moved from Kennedy Elementary) No plumbing so no restrooms. There will be a deck and a ramp installed also.  P2120.3.23.15 3/23/2015  Approved
3/26/2015
Approved
3/25/2015
PendingN/A NEW
300 Main Ave  Jimmy Johns Drive-Thru   Remodel the parking lot to create a drive-thru for Jimmy Johns  P300.3.23.15 3/23/2015  Approved
3/26/2015
Approved
3/25/2015
PendingN/A Ready
W-SignOffs
4106 14 Ave N  Mjolsness Building 2  Construct a new building for self storage  P4106.03.19.15 3/19/2015  Pending
3/26/2015
Approved
3/25/2015
PendingN/A Rvwd W-R
4102 14 Ave N  Mjolsness Building 1  Construct a new building for self storge  P4102.03.19.15 3/19/2015  Pending
3/26/2015
Approved
3/25/2015
PendingN/A Rvwd W-R
612 1 Ave N  Pounds Restaurant  Remodel of existing restaurant  p612.3.18.15 3/18/2015  N/AN/AApproved
3/25/2015
Approved
3/18/2015
Review I-P
9500 39 St S  KPH  Construct 2 story sprinklered office and shop to be used as company headquarters. Also construct a 12,000 sf, non-sprinklered cold storage building.   P9500.3.16.15 3/16/2015  Pending
3/26/2015
Approved
3/19/2015
Pending
3/23/2015
N/A NEW
4511 13 Ave N  Mechanical Insulation and Supply  Construct a new building for cold storage.   P4511.3.13.15 3/13/2015  Pending
3/23/2015
Rejected
3/17/2015
PendingN/A Rvwd W-R
3501 Westrac Drive  Centre Inc  ** Civil drawings Resubmitted 3.11.15 JS **
Construct a 2 story transitional stay facility for women.  
P3501.02.25.15 3/12/2015  Approved
3/23/2015
Approved
3/16/2015
Approved
3/19/2015
Approved
3/12/2015
Review I-P
3501 Westrac Drive  Centre Inc  Construct a 2 story transitional stay facility for women.   P3501.02.25.15 2/25/2015  PendingApproved
2/26/2015
Approved
3/5/2015
Approved
2/26/2015
Superseded
1040 35 St N  Bill's Gun Shop  Construct a retail gunshop with an indoor firing range. There will be warehouse space for both the retail sales and the gunsmith.   P1040.3.5.15 3/5/2015  Approved
3/23/2015
Pending
3/6/2015
Pending
3/19/2015
N/A Rvwd W-R
1443 42 St S  King Leo's  Construct addition to existing Building and fit-up the interior for the restaurant.  P1443.3.5.15 3/5/2015  Fnd only
3/12/2015
Approved
3/6/2015
Pending
3/12/2015
Approved
3/9/2015
Rvwd W-R
201 1 Ave N  Fargo City Hall  Construct new City Hall  P201.3.4.15 3/5/2015  PendingPendingPendingN/A NEW
5400 42 St S  Aurora Ponds Apts.  **Re-Submittal of revised sheets C1.1, C2.1, C5.1 and L1.1 per planning 3.3.15**
Construct a 33 unit apartment building with detached garages. 
P5400.2.4.15 3/3/2015  Pending
3/4/2015
Approved
3/4/2015
PendingN/A Rvwd W-R
5400 42 St S  Aurora Ponds Apts.  Construct a 33 unit apartment building with detached garages.  P5400.2.4.15 2/4/2015  Pending
2/10/2015
Approved
2/10/2015
Pending
2/12/2015
N/A Superseded
1431 Albrecht Blvd N  NDSU Reed Hall  Remodel the bathrooms on all three floors in Reed Hall  P1431.2.27.15 2/27/2015  N/AN/AN/AN/A Rvwd W-R
1617 32 Ave S  Juice It  Fit up lease space for juice bar  P1617.2.27.15 2/27/2015  N/AN/AN/A Approved
3/3/2015
OK to ISSUE
4255 30 Ave S  Bethany on 42nd Independent Living  **Re-Revised civil and landscape plans***
Revised landscape site plans***
Construct a 4 story addition including relocation of pharmacy and dining areas.  
P4255.01.06.15 2/25/2015  Pending
3/23/2015
Approved
2/25/2015
Approved
3/25/2015
Approved
2/26/2015
Rvwd W-R
4255 30 Ave S  Bethany on 42nd Independent Living  Revised landscape site plans***
Construct a 4 story addition including relocation of pharmacy and dining areas.  
P4255.01.06.15 2/5/2015  Pending
2/6/2015
Approved
2/5/2015
Pending
2/12/2015
Approved
2/11/2015
Superseded
4255 30 Ave S  Bethany on 42nd Independent Living  Construct a 4 story addition including relocation of pharmacy and dining areas.   P4255.01.06.15 1/6/2015  Pending
1/16/2015
Approved
1/9/2015
Pending
1/15/2015
Approved
1/16/2015
Superseded
3117 Fiechtner Dr  T & S Shop  **New plan submitted 02-25-15
**new plan submitted 02-13-15
**new plan submitted 02-11-15
**new plan submitted 12-15-14
Construct a new shop building. 
P3117.12.08.14 2/25/2015  Approved
2/26/2015
Approved
2/25/2015
Pending
3/10/2015
N/A Ready
W-SignOffs
3117 Fiechtner Dr  T & S Shop  **new plan submitted 02-13-15
**new plan submitted 02-11-15
**new plan submitted 12-15-14
Construct a new shop building. 
P3117.12.08.14 2/13/2015  PendingApproved
2/13/2015
Pending
2/17/2015
N/A Superseded
3117 Fiechtner Dr  T & S Shop  **new plan submitted 02-11-15
**new plan submitted 12-15-14
Construct a new shop building. 
P3117.12.08.14 2/11/2015  Pending
2/12/2015
PendingPendingN/A Superseded
3117 Fiechtner Dr  T & S Shop  **new plan submitted 12-15-14
Construct a new shop building. 
P3117.12.08.14 12/15/2014  PendingApproved
12/15/2014
PendingN/A Superseded
3500 38 Ave S  Rabbit River Building 2  **New landscaping plan and New Civil drawings 2.23.15**
##Updated Landscape Plan## 2-6-15##
**new plan submitted 01-28-15
Construct a new 30 unit apartment building with associated garages.  
P3500.01.20.15 2/23/2015  Approved
2/25/2015
Approved
2/24/2015
Fnd only
3/11/2015
N/A FND Issued
Ready with
SignOffs
3500 38 Ave S  Rabbit River Building 2  ##Updated Landscape Plan## 2-6-15##
**new plan submitted 01-28-15
Construct a new 30 unit apartment building with associated garages.  
P3500.01.20.15 2/6/2015  PendingPending
2/9/2015
Pending
2/12/2015
N/A Superseded
3500 38 Ave S  Rabbit River Building 2  **new plan submitted 01-28-15
Construct a new 30 unit apartment building with associated garages.  
P3500.01.20.15 1/28/2015  Pending
1/30/2015
PendingPending
1/30/2015
N/A Superseded
3500 38 Ave S  Rabbit River Building 2  Construct a new 30 unit apartment building with associated garages.   P3500.01.20.15 1/20/2015  Pending
1/30/2015
Pending
1/21/2015
Pending
1/28/2015
N/A Superseded
3450 38 Ave S  Rabbit River Office  **New landscaping plan and New Civil drawings 2.23.15**
##Updated Landscape Plan## 2-6-15##
**new plans submitted 01-28-15
Construct a new office building with associated parking lot 
P3450.01.20.15 2/23/2015  Approved
2/25/2015
Approved
2/24/2015
Fnd only
3/11/2015
N/A Rvwd W-R
3450 38 Ave S  Rabbit River Office  ##Updated Landscape Plan## 2-6-15##
**new plans submitted 01-28-15
Construct a new office building with associated parking lot 
P3450.01.20.15 2/6/2015  PendingPending
2/9/2015
Pending
2/12/2015
N/A Superseded
3450 38 Ave S  Rabbit River Office  **new plans submitted 01-28-15
Construct a new office building with associated parking lot 
P3450.01.20.15 1/28/2015  PendingPendingPending
2/6/2015
N/A Superseded
3480 38 Ave S  Rabbit River Building 1  **New landscaping plan and New Civil drawings**
##Updated Landscape Plan## 2-6-15##
Construct a new 30 unit apartment building with associated garages.  
P3480.01.20.15 2/23/2015  Approved
2/25/2015
Approved
2/24/2015
Pending
3/11/2015
N/A Rvwd W-R
3480 38 Ave S  Rabbit River Building 1  ##Updated Landscape Plan## 2-6-15##
Construct a new 30 unit apartment building with associated garages.  
P3480.01.20.15 2/6/2015  PendingPending
2/9/2015
Pending
2/12/2015
N/A Superseded
3480 38 Ave S  Rabbit River Building 1  Construct a new 30 unit apartment building with associated garages.   P3480.01.20.15 1/20/2015  Pending
1/30/2015
Pending
1/21/2015
Pending
1/28/2015
N/A Superseded
3902 13 Ave S  JC Penny  Remodel the "Big Shoe" department area and the "Home" ancillary department inside JC Penny.  P3902.2.23.15 2/23/2015  N/AN/AN/AN/A OK to ISSUE
2800 Main Ave  TNT Kids Fitness and Gymnastics Academy  Remodel existing one story building for offices, education and gym space. A slab on grade addition is also included.  P2800.2.23.2015 2/23/2015  Approved
2/24/2015
Approved
2/23/2015
Pending
3/17/2015
N/A Review I-P
503 7 St N  Dog ID's  Fit up space for new office  P503.02.13.15 2/13/2015  N/AN/APending
3/10/2015
N/A NEW
1955 15 Ave N  NDSU AES   Construct a new agricultural service center building. Existing building will be removed removed under a separate contract.   P1955.02.12.15 2/12/2015  Pending
3/26/2015
Approved
2/13/2015
Approved
3/17/2015
N/A Rvwd W-R
314 27 St N  Midwest Motor Express  Interior remodel and parking lot changes  P314.02.09.15 2/9/2015  Approved
2/10/2015
Approved
2/10/2015
Approved
2/18/2015
N/A Rvwd W-R
3361 Westrac Dr  Biolife Plasma Services  Update plans in response to city comments###
**edit address from 3315 to 3361 CR 1-26-15
Site plan review and approval for the construction of a proposed Biolife Plasma Services building with associated parking, utilities, landscaping and storm water management.  
P3361.01.08.14 2/6/2015  Approved
2/10/2015
Approved
2/9/2015
Pending
3/10/2015
N/A Rvwd W-R
3361 Westrac Dr  Biolife Plasma Services  **edit address from 3315 to 3361 CR 1-26-15
Site plan review and approval for the construction of a proposed Biolife Plasma Services building with associated parking, utilities, landscaping and storm water management.  
P3361.01.08.14 1/8/2015  Pending
1/14/2015
Approved
1/8/2015
Pending
1/15/2015
N/A Superseded
1400 Elm St N  El Zagal Clubhouse  Construct new clubhouse, warming house, golf cart storage, and support spaces for golf course.  p1400.2.6.15 2/6/2015  Approved
2/6/2015
Approved
2/9/2015
Pending
2/23/2015
N/A Ready
W-SignOffs
2921 Seter Pkwy S  Urban Dental Health  New dental facility with full basement  p2921.2.5.15 2/5/2015  Pending
2/9/2015
Approved
2/9/2015
Pending
2/24/2015
N/A Rvwd W-R
821 5 Ave S  Grace Lutheran Church  Updated site plan and landscape plan***
Construct an addition to the existing Church.  
P821.01.14.15 2/5/2015  Pending
2/5/2015
Approved
2/9/2015
Approved
3/4/2015
N/A Ready
W-SignOffs
821 5 Ave S  Grace Lutheran Church  Construct an addition to the existing Church.   P821.01.14.15 1/14/2015  Pending
1/16/2015
Approved
1/19/2015
Pending
1/22/2015
N/A Superseded
414 4 Ave N  Proof Artisan Distillers  Fit-up kitchen  p414.2.4.15 2/4/2015  N/AApproved
2/6/2015
N/A Approved
2/6/2015
OK to ISSUE
315 27 Cir S  Northern Stone Warehouse  Build a new pre-engineered metal building for Northern Stone. Site plans only submitted at this time.  p315.2.2.15 2/2/2015  Pending
2/4/2015
Approved
2/3/2015
Pending
2/6/2015
N/A Rvwd W-R
1511 12 Ave N  NDSU Music Building  Remove and replace vestibule.   P1511.01.29.15 1/30/2015  N/AN/AN/AN/A OK to ISSUE
1800 University Dr N  FargoDome Floor Replacement  Remove and replace concrete floor for mechanical and electrical upgrades  P1800.01.28.15 1/28/2015  N/AN/AN/AN/A OK to ISSUE
400 1 Ave S  YMCA Family Pool Addition  Construct an addition to the existing pool area including remodeling the existing area.   P400.01.20.15 1/20/2015  Approved
1/30/2015
Approved
1/22/2015
Pending
2/12/2015
Pending Rvwd W-R
7045 15 St S  Dakota Boys and Girls Ranch Addition  Construct a 23,000 addition to be used at gym, kitchen, dining, offices and chapel/meting room.   P7045.01.14.15 1/14/2015  Pending
1/16/2015
Approved
1/14/2015
Pending
1/28/2015
Approved
1/23/2015
Rvwd W-R
435 14 Ave S  Water Treatment Plant Expansion  **new plans submitted 12-30-14
Construct an addition to the water treatment plant.  
P435.09.03.14 12/31/2014  Approved
12/31/2014
Approved
1/14/2015
PendingPending Rvwd W-R
435 14 Ave S  Water Treatment Plant Expansion  Construct an addition to the water treatment plant.   P435.09.03.14 9/3/2014  Approved
9/18/2014
PendingPendingPending Superseded
1340 Administration Ave  NDSU Old Main  Remove and replace windows and reconfigure the south vestibule  P1340.12.24.14 12/24/2014  N/AN/AN/AN/A OK to ISSUE
3901 30 Ave S  West 29 Building 4  **new plans submitted 12-11-14
**new civil plans submitted 12-05-14
**new civil plans submitted 11-19-14
Construct a new 42 unit apartment building with associated garages 
P3901.11.07.14 12/11/2014  Approved
12/30/2014
Approved
12/22/2014
Approved
12/23/2014
N/A Permitted
3885 30 Ave S  West 29 Building 3  **new plans submitted 12-11-14
**new civil plans submitted 12-05-14
**new civil plans submitted 11-18-14
Construct a new 42 unit apartment building with associated garages 
P3885.11.07.14 12/11/2014  Approved
12/30/2014
Approved
12/22/2014
Approved
12/23/2014
N/A Permitted
3839 30 Ave S  West 29 Building 2  **new plans submitted 12-11-14
**new civil plans submitted 12-05-14
**new civil plans submitted 11-18-14
Construct a new 42 unit apartment building with associated garages 
P3839.11.07.14 12/11/2014  Approved
12/30/2014
Approved
12/22/2014
Approved
12/23/2014
N/A Permitted
3807 30 Ave S  West 29 Building 1  **new civil plans submitted 12-11-14
**new civil plans submitted 12-05-14
**new civil plan submitted 11-18-14
Construct a new 42 unit apartment building with associated garages 
P3807.11.07.14 12/11/2014  Approved
12/30/2014
Approved
12/22/2014
Approved
12/23/2014
N/A Permitted
4087 2 Ave S  Driscoll Commercial Project  Construct a 40 x 22 garage/storage building  P4087.11.05.14 11/5/2014  Approved
11/7/2014
Approved
11/12/2014
Approved
11/13/2014
N/A OK to ISSUE
1403 48 St S  Noridian  Construct a temporary parking lot  P1403.10.29.14 10/29/2014  Pending
11/19/2014
Approved
10/31/2014
Pending
1/7/2015
N/A Ready
W-SignOffs
5949 53 Ave S  Plecity-Kowalski Const  **new plan submitted 10-29-14
New office and shop with additional shop space for rental. 
p5949.10.24.14 10/29/2014  Approved
11/4/2014
Approved
10/30/2014
Pending
11/5/2014
N/A Ready
W-SignOffs
5949 53 Ave S  Plecity-Kowalski Const  New office and shop with additional shop space for rental.  p5949.10.24.14 10/24/2014  PendingRejected
10/27/2014
PendingN/A Superseded
1507 19 Ave N  Days Inn Remodel and Addition  **new civil plans submitted 10/22/14**
**new plans submitted 10/21/14**
Construct an addition and remodel the existing hotel. 
P1507.09.25.14 10/22/2014  Approved
10/22/2014
Approved
10/24/2014
Approved
10/30/2014
Approved
10/31/2014
OK to ISSUE
1609 19 Ave N  Fargo Air Museum  Construct a walk way between the two exiting buildings  P1609.09.23.14 9/23/2014  Approved
9/25/2014
Rejected
10/3/2014
Approved
9/29/2014
N/A Rejected
1020 1 Ave N  Contractor Services Residence  Demolish the existing home and construct a new one. Contractor is requesting foundation only at this time.  P1020.09.22.14 9/22/2014  N/AN/AFnd only
9/24/2014
N/A FND Issued
NEED Bldg
Plans
4215 Main Ave  Valley Reconditioning  Construct a new pre engineered steel structure and parking lot to be used for associated services.   P4215.06.17.14 6/17/2014  Pending
6/27/2014
Approved
6/18/2014
PendingN/A Rvwd W-R
4159 17 Ave S  Red Robin Restaurant  Being re-bid this winter jfm
**new building plans submitted 05-15-14
Construct a new restaurant 
P4159.04.09.14 5/15/2014  Approved
5/27/2014
Approved
5/16/2014
Approved
5/23/2014
Approved
5/22/2014
On Hold
4159 17 Ave S  Red Robin Restaurant  Construct a new restaurant  P4159.04.09.14 4/9/2014  Pending
5/6/2014
Approved
4/11/2014
Approved
4/21/2014
Approved
4/10/2014
Superseded
5100 Prosperity Way  Silver Lining Assisted Living  **new plan submitted 05-12-14
**Site plan and Fnd only, No Bldg Plans**
Construct a single story assisted living building.  
P5100.04.15.14 5/12/2014  Pending
8/7/2014
Approved
5/13/2014
Approved
5/23/2014
Approved
6/12/2014
Rvwd W-R
5100 Prosperity Way  Silver Lining Assisted Living  **Site plan and Fnd only, No Bldg Plans**
Construct a single story assisted living building.  
P5100.04.15.14 4/15/2014  Pending
5/12/2014
Approved
4/17/2014
Pending Approved
4/28/2014
Superseded