Plans listed as pending or rejected need to be amended / modified and submitted for further review. Project number is address.date (Date project originally submitted). Date is date of last submittal.

Planning Department:

Planning/Zoning - 701-241-1474 - 200 3rd Street North - This department reviews for compliance with the most current Land Development Code. Including but not limited to the use and dimensional requirements, landscaping and all zoning requirements.

Engineering Department:

Engineer - 701-241-1549 - 200 3rd Street North - This department will review for compliance with the most current engineering standards. Including but not limited to site access to right-of-ways, site drainage, presence and location of services, and presence of any city easements.

Fire Department:

Fire Marshal - 701-241-8139 - 637 NP Avenue North - This department will review for compliance with the most current Fire Codes. Including but not limited to the necessary proximity and numbers of fire hydrants both on public and private property, the location and sufficiency of access drives on your property, and turning radii available on your site for department vehicles.

Health Department:

Restaurant-Food/Environmental Health Practitioner - 701-241-1387 - 2301 8th Avenue North - This department will review for compliance with the most current restaurant codes.

Filters:


Comments:

Left by:

Date:

Address Project Title Description Project Date Eng. Fire Plan. Hlth. Inspections
630 1 Ave N  Co-Schedule Fit-Up  Fit up suite 8 for use as offices and meeting rooms.  p630.3.29.17 3/29/2017  N/A N/A New N/A NEW
502 Oak St N  Diamond Rock Townhomes  **New landscape/site plan submitted 3/28/17**
Construct 4-unit townhome on lot with existing buildings. Location has received a Conditional Use Permit and LDZS setback waiver. **ADDRESS WAS 501 1 ST N** 
p501.3.7.17 3/28/2017  New Approved
3/29/2017 by Ryan Erickson
New N/A NEW
502 Oak St N  Diamond Rock Townhomes  Construct 4-unit townhome on lot with existing buildings. Location has received a Conditional Use Permit and LDZS setback waiver. **ADDRESS WAS 501 1 ST N**  p501.3.7.17 3/7/2017  Pending
3/29/2017 by Ron S.
Approved
3/7/2017 by Ryan Erickson
Pending
3/10/2017 by Kylie Murphy
N/A Reviewed-
Waiting
Response
3/17/2017 by MGaulrapp
4546 32 Ave S  Hair Success Building  **New interior plans submitted 3/28/17**
Building shell and fit-up on previously approved foundation, for use as salon and spa. 
p4546.2.13.17 3/28/2017  N/A Approved
3/29/2017 by Ryan Erickson
New New Reviewed-
Waiting
Response
4546 32 Ave S  Hair Success Building  Building shell and fit-up on previously approved foundation, for use as salon and spa.  p4546.2.13.17 2/13/2017  N/A Approved
2/15/2017 by Ryan Erickson
Approved
3/3/2017 by ANelson
Rejected
2/17/2017 by Derek
Superseded
415 4 St N  Fargo Public Schools Parking Lot  **Sheets C100, C101, and C105 resubmitted 3/28/17**
Replace storm sewer and existing parking lot. 
p415.3.9.17 3/28/2017  New Approved
3/28/2017 by Ryan Erickson
New N/A Ready
With
SignOffs
3/29/2017 by Peter V.
415 4 St N  Fargo Public Schools Parking Lot  Replace storm sewer and existing parking lot.  p415.3.9.17 3/9/2017  Pending
3/22/2017 by Ron S
Approved
3/13/2017 by Ryan Erickson
Pending
3/23/2017 by Kylie Murphy
N/A Ready
With
SignOffs
3/23/2017 by Peter V.
114 Broadway N  Black Building Office  Remodel former salon on the 7th floor for use as office space. Work to include removal of extraneous mechanical equipment.  p114.3.28.17 3/28/2017  N/A N/A New N/A NEW
1411 Albrecht Ave  NDSU Residence Dining Center  Remodel of existing NDSU Dining Center  P1411.3.21.17 3/23/2017  N/A Approved
3/27/2017 by Ryan Erickson
N/A New Review in
Progress
1023 1 Ave S  Craig Properties   Construct a new 10 unit apartment building with associated parking garage.   P1023.03.21.17 3/21/2017  Pending
3/28/2017 by Ron S
Approved
3/24/2017 by Ryan Erickson
New N/A Reviewed-
Waiting
Response
3/29/2017 by Peter V.
3285 Fiechtner Dr  Dr Terry Moe Dental  fit up space for dental office  P3285.03.21.17 3/21/2017  N/A N/A N/A N/A Reviewed-
Waiting
Response
3285 Fiechtner Dr  McInnes Office  fit up for office  P3285.03.21.17 3/21/2017  N/A N/A N/A N/A OK to ISSUE
3/28/2017 by Peter V.
4480 26 Ave S  Starbucks New Shell Building  Construct shell building and parking lot for future fit-up as a coffee shop.  p4480.3.17.16 3/17/2017  Approved
3/29/2017 by Ron
Approved
3/21/2017 by Ryan Erickson
Pending
3/23/2017 by Kylie Murphy
Approved
3/28/2017 by Ken Tinquist
Reviewed-
Waiting
Response
3/22/2017 by PV
1213 Northern Pacific Ave N  WildTerra Cidery Remodel  Remodel 6 12 St N building for use as a brewery. Replace adjacent sidewalk, parking lot, and alley.  p1213.3.17.17 3/17/2017  Pending
3/26/2017 by Ron S
Approved
3/22/2017 by Ryan Erickson
New Rejected
3/21/2017 by Aaron Johnson
Reviewed-
Waiting
Response
4321 20 Ave S  Discovery Benefits Building Addition  Construct two-story addition to existing building for use as offices.  p4321b.3.17.17 3/17/2017  Pending
3/27/2017 by Ron S
Approved
3/21/2017 by Ryan Erickson
New N/A NEW
4321 20 Ave S  Discovery Benefits Parking Lot Addition  Remove a portion of existing parking lot and underground, replace and expand.  p4321.3.17.17 3/17/2017  Pending
3/26/2017 by Ron S.
Approved
3/21/2017 by Ryan Erickson
New N/A NEW
3450 38 Ave S  Rabbit River Office Building  Construct new, 3,200 square foot office building.  p3450.3.16.17 3/16/2017  Pending
3/29/2017 by Ron
Approved
3/21/2017 by Ryan Erickson
Pending
3/24/2017 by Kylie Murphy
N/A Reviewed-
Waiting
Response
969 34 St N  Fargo Automation  Construct 33'x80' addition to existing factory and office building for use as offices.  p969.3.16.17 3/16/2017  New Approved
3/21/2017 by Ryan Erickson
New N/A Reviewed-
Waiting
Response
1100 19 Ave N  Summit Nutrition  Fit up Suite O to be used for shake preparation and sales.  p1100.3.14.17 3/14/2017  N/A N/A N/A Approved
3/20/2017 by Brad Schneider
Permitted
3/23/2017 by Peter V.
1110 3 Ave N  Twin Towers Balconies  Remove and replace existing exterior balconies and metal siding.  p1110.3.14.17 3/14/2017  N/A N/A Approved
3/24/2017 by ANelson
N/A NEW
4901 15 Ave S  New Elementary School  **New civil plans submitted 3/13/17**
Construct new elementary school with offices, administration, gymnasium, common areas, and three classroom wings. 
p4901.2.22.17 3/13/2017  Approved
3/24/2017 by Ron
Approved
3/15/2017 by Ryan Erickson
Approved
3/22/2017 by ANelson
N/A OK to ISSUE
3/28/2017 by PV
4901 15 Ave S  New Elementary School  Construct new elementary school with offices, administration, gymnasium, common areas, and three classroom wings.  p4901.2.22.17 2/22/2017  Pending
3/2/2017 by Ron S
Approved
2/24/2017 by Ryan Erickson
Approved
3/9/2017 by Nelson
Approved
3/7/2017 by Brad Schneider
Superseded
2/23/2017 by PV
614 Main Ave  Front Street Rear Deck  Construct rear deck.  p614.3.13.17 3/13/2017  N/A N/A Approved
3/17/2017 by ANelson
Approved
3/15/2017 by Aaron Johnson
Reviewed-
Waiting
Response
1431 Albrecht Blvd N  Reed Hall Elevator Replacement  Replace existing elevator with new elevator  p1431.3.10.17 3/10/2017  N/A N/A N/A N/A Reviewed-
Waiting
Response
4648 32 Ave S  Blu Water Creek Private Road  Construct private road extending 590' east from 47th St S and associated infrastructure.  p4648.3.10.17 3/10/2017  Approved
3/24/2017 by Ron
Approved
3/13/2017 by Ryan Erickson
Approved
3/17/2017 by ANelson
N/A NEW
123 Broadway N  DFI 2nd Floor  Remodel office space on second floor and fit up for new tenant.  p123.3.9.17 3/9/2017  N/A N/A Approved
3/21/2017 by ANelson
N/A Reviewed-
Waiting
Response
4839 38 St S  The Edition, Building 2  **New plans submitted 3/9/17, still requesting foundation only**
Construct 3-story, 36-unit apartment building with detached garages. CONTRACTOR IS REQUESTING FOUNDATION ONLY AT THIS TIME. **Address changed from 5039 38 St S** 
p5039.11.4.16 3/9/2017  Pending
3/22/2017 by Ron S
Approved
3/10/2017 by Ryan Erickson
Approved
3/15/2017 by ANelson
N/A Ready
With
SignOffs
3/17/2017 by Peter V.
4839 38 St S  The Edition, Building 2  Construct 3-story, 36-unit apartment building with detached garages. CONTRACTOR IS REQUESTING FOUNDATION ONLY AT THIS TIME. **Address changed from 5039 38 St S**  p5039.11.4.16 11/4/2016  Pending
11/10/2016 by Ron S.
Pending
11/9/2016 by Ryan Erickson
Pending
11/15/2016 by MElshaug
N/A Superseded
2/14/2017 by PeterV
4835 38 St S  The Edition, Building 1  **New plans submitted 3/9/17, still requesting foundation only**
Construct 3-story, 36-unit apartment building with detached garages. CONTRACTOR IS REQUESTING FOUNDATION ONLY AT THIS TIME. **Address changed from 5035 38 St S** 
p5035.11.4.16 3/9/2017  Pending
3/22/2017 by Ron S
Approved
3/10/2017 by Ryan Erickson
Approved
3/15/2017 by ANelson
N/A Ready
With
SignOffs
3/17/2017 by Peter V.
4835 38 St S  The Edition, Building 1  Construct 3-story, 36-unit apartment building with detached garages. CONTRACTOR IS REQUESTING FOUNDATION ONLY AT THIS TIME. **Address changed from 5035 38 St S**  p5035.11.4.16 11/4/2016  Pending
11/10/2016 by Ron S.
Pending
11/9/2016 by Ryan Erickson
Pending
1/11/2017 by MElshaug
N/A Superseded
2/14/2017 by PV
1895 45 St S  Sleep Number Fit-Up  **New plans submitted 3/9/17**
Fit up lease space for use as a retail store. 
p1895.2.16.17 3/9/2017  N/A N/A N/A N/A OK to ISSUE
3/9/2017 by Peter V.
1895 45 St S  Sleep Number Fit-Up  Fit up lease space for use as a retail store.  p1895.2.16.17 2/16/2017  N/A N/A N/A N/A Superseded
2/28/2017 by Peter
2624 9 Ave S  SE Human Service Center Remodel  Remodel all floors of an existing building. Use to remain unchanged.  p2624.3.8.17 3/8/2017  N/A N/A N/A N/A OK to ISSUE
3/22/2017 by Peter V.
114 Broadway N  Black Building and Scan Design  **New interior plans submitted 3/8/17**
**Supplement for separating storm and sanitary sewer lines submitted 1/26/17**
Remodel existing eight-story building with attic and attached two-story building including exterior repairs. 
p114.12.21.16 3/8/2017  N/A N/A Approved
3/24/2017 by ANelson
N/A NEW
114 & 118 Broadway N  Black Building and Scan Design  **Supplement for separating storm and sanitary sewer lines submitted 1/26/17**
Remodel existing eight-story building with attic and attached two-story building including exterior repairs. 
p114.12.21.16 1/26/2017  Approved
2/8/2017 by Ron
Approved
1/27/2017 by Ryan Erickson
Approved
2/1/2017 by ANelson
New Reviewed-
Waiting
Response
114 & 118 Broadway N  Black Building and Scan Design  Remodel existing eight-story building with attic and attached two-story building including exterior repairs.  p114.12.21.16 12/21/2016  N/A Approved
1/13/2017 by Ryan Erickson
Approved
1/11/2017 by MElshaug
New Superseded
4150 19 Ave S  Common Area Fit-Up  Fit up 2nd floor hallway and conference room in previously permitted office building.  p4150.3.8.17 3/8/2017  N/A N/A N/A N/A Reviewed-
Waiting
Response
3/14/2017 by PV
2901 40 Ave N  Pro Landscapers Site Work  **Sheets C-1 to C-9 submitted 3/7/17**
**Sheets C-1, C-4, C-5, and C-9 submitted 9/22/16**
**Plans for building submitted 9/13/16**
Site work and parking lot for new building.
**Address updated from 2715 40 Ave N** 
p2715.8.18.16 3/7/2017  Pending
3/20/2017 by Ron
Approved
3/8/2017 by Ryan Erickson
Approved
3/14/2017 by Nelson
N/A Reviewed-
Waiting
Response
2901 40 Ave N  Pro Landscapers Site Work  **Sheets C-1, C-4, C-5, and C-9 submitted 9/22/16**
**Plans for building submitted 9/13/16**
Site work and parking lot for new building.
**Address updated from 2715 40 Ave N** 
p2715.8.18.16 9/22/2016  Pending
9/29/2016 by Jason L
Approved
9/23/2016 by Ryan Erickson
Pending
9/27/2016 by MElshaug
N/A Superseded
2901 40 Ave N  Pro Landscapers Site Work  **Plans for building submitted 9/13/16**
Site work and parking lot for new building.
**Address updated from 2715 40 Ave N** 
p2715.8.18.16 9/13/2016  Pending
9/29/2016 by Jason
Approved
9/14/2016 by Ryan Erickson
Pending
9/15/2016 by MElshaug
N/A Superseded
2901 40 Ave N  Pro Landscapers Site Work  Site work and parking lot for new building.
**Address updated from 2715 40 Ave N** 
p2715.8.18.16 8/18/2016  Pending
9/14/2016 by Jason Leonard
Approved
8/24/2016 by Ryan Erickson
Pending
8/26/2016 by MElshaug
N/A Superseded
4801 Amber Valley Pkwy S  Gamma Center Addition & Remodel  **Building plans submitted 3/7/17**
Foundation only for a two-story addition between existing wings of a research facility, remodel adjacent spaces, and add elevator to existing building. 
p4801.10.19.16 3/7/2017  Approved
3/21/2017 by Ron
Approved
3/9/2017 by Ryan Erickson
Approved
3/22/2017 by ANelson
N/A Review in
Progress
4801 Amber Valley Pkwy S  Gamma Center Addition & Remodel  Foundation only for a two-story addition between existing wings of a research facility, remodel adjacent spaces, and add elevator to existing building.  p4801.10.19.16 10/19/2016  Approved
10/26/2016 by Ron
Approved
10/24/2016 by Ryan Erickson
Approved
11/8/2016 by MElshaug
N/A FND Issued-
Need building
Plans
11/10/2016 by JDS
5050 Timber Pkwy S  Polished Nail Spa  Fit up existing lease space for use as a nail salon.  p5050.3.3.17 3/3/2017  N/A N/A N/A N/A OK to ISSUE
3/23/2017 by Peter V.
3000 32 Ave S  Essentia Inpatient Pharmacy Remodel  Remodel lower level inpatient pharmacy suite.  p3000a.3.2.17 3/2/2017  N/A N/A N/A New Reviewed-
Waiting
Response
3/16/2017 by Doug
3000 32 Ave S  Essentia CEU/PET/CT Scan  Remodel existing shell space on first floor for expansion of infusion, CEU patient suites, PET, and CT scan suites.  p3000.3.2.17 3/2/2017  N/A N/A N/A Approved
3/9/2017 by Hunter
OK to ISSUE
3/28/2017 by Peter V.
1551 45 St S  Scheels All Sports Remodel  Remodel portions of existing retail store, including food service areas.  p1551.3.1.17 3/1/2017  N/A N/A N/A Approved
3/7/2017 by Ken Tinquist
NEW
3825 Fiechtner Dr S  Salt20 Float Center  Fit up existing lease space for use as a float center spa.  p3285.3.1.17 3/1/2017  N/A N/A Approved
3/9/2017 by ANelson
Rejected
3/28/2017 by Chris Ohman
Reviewed-
Waiting
Response
3985 56 St S  Nutrition Burst Fit-Up  **Sheet A100 resubmitted 2/16/17**
Fit up space #4 to be use for non-alcoholic beverage sales. 
p3960.2.2.17 2/16/2017  N/A N/A Approved
2/27/2017 by ANelson
Approved
2/21/2017 by Ken Tinquist
OK to ISSUE
3/9/2017 by JDS
3985 56 St S  Nutrition Burst Fit-Up  ***Address changed long time ago 2.21.17 JDS***
Fit up space #4 to be use for non-alcoholic beverage sales. 
p3960.2.2.17 2/2/2017  N/A N/A Approved
2/14/2017 by ANelson
Approved
2/3/2017 by Ken Tinquist
Superseded
4539 33 Ave S  Bentley Square Driveway  Civil sheets C0.2, C2.3, C3.1, C5.1 showing driveway omitted from original submittal.  p4539.2.10.17 2/10/2017  Approved
2/27/2017 by Ron
Approved
2/13/2017 by Ryan Erickson
Pending
2/15/2017 by Barrett Voigt
N/A NEW
4202 13 Ave S  Target Remodel  Remodel accessories, apparel, and market areas with new finishes and lighting. The market area will have a ceiling feature added.  p4202.2.8.17 2/8/2017  N/A N/A N/A N/A OK to ISSUE
2/24/2017 by CR
3195 49 St S  Encore Apts Building 3  Construct new, 54-unit apartment building and detached garages.  p3195.2.6.17 2/6/2017  Approved
3/7/2017 by Ron
Approved
2/7/2017 by Ryan Erickson
Approved
3/17/2017 by ANelson
N/A Ready
With
SignOffs
3/8/2017 by PV
3155 49 St S  Encore Apts Building 4  Construct new, 54-unit apartment building and detached garages.  p3155.2.6.17 2/6/2017  Approved
3/7/2017 by Ron
Approved
2/7/2017 by Ryan Erickson
Approved
3/17/2017 by ANelson
N/A Ready
With
SignOffs
3/8/2017 by Peter V.
3101 49 St S  Encore Apts Building 5  Construct new, 36-unit apartment building and detached garages.  p3101.2.6.17 2/6/2017  Approved
3/7/2017 by Ron
Approved
2/7/2017 by Ryan Erickson
Approved
3/17/2017 by ANelson
N/A Ready
With
SignOffs
3/8/2017 by Peter V.
1709 35 St S  Newman Building 2  Construct new, 66-unit apartment building.  p1709.2.6.17 2/6/2017  Approved
2/9/2017 by Ron
Approved
2/7/2017 by Ryan Erickson
Approved
2/17/2017 by ANelson
N/A NEW
3409 45 St S  Brandt Office Building  **Sheet L1.1 resubmitted 2/2/17**
Construct one-story office building and parking lot. 
p3409.1.5.17 2/2/2017  Approved
2/6/2017 by Ron
Approved
2/3/2017 by Ryan Erickson
Approved
2/9/2017 by ANelson
N/A Reviewed-
Waiting
Response
3409 45 St S  Brandt Office Building  Construct one-story office building and parking lot.  p3409.1.5.17 1/5/2017  Approved
1/25/2017 by Rachel
Approved
1/5/2017 by Ryan Erickson
New N/A Superseded
4671 38 St S  Cobalt Hospital Landscaping  Updated sheets L1.01-L1.04 for previously permitted building.  p4671.2.1.17 2/1/2017  Approved
2/6/2017 by Ron
Approved
2/2/2017 by Ryan Erickson
Approved
2/14/2017 by ANelson
N/A Need signoffs-
No Permit
Required
3/2/2017 by Doug
1800 University Dr N  FargoDome Accessible Seating Expansion  Expand handicapped accessible seating in existing arena.  p1800.2.1.17 2/1/2017  N/A N/A N/A N/A OK to ISSUE
3/21/2017 by Peter V.
4349 48 Ave N  FM Home & Patio Addition  Construct 27'x26' addition to existing building.  p4349.1.13.17 1/13/2017  Approved
2/13/2017 by Ron
Approved
1/17/2017 by Ryan Erickson
Approved
3/1/2017 by ANelson
N/A Reviewed-
Waiting
Response
3/14/2017 by Peter
217 Roberts St N  Robert Street Mixed Use  **Interior and window changes submitted 1/13/17**
**Building plans submitted 11/25/16. Routing fee is for changed total value.**
Footing and foundation for a 72-unit, mixed-use wrap building around the previously permitted parking ramp. 
p217.10.13.16 1/13/2017  N/A N/A Approved
1/18/2017 by MElshaug
N/A NEW
217 Roberts St N  Robert Street Mixed Use  **Building plans submitted 11/25/16. Routing fee is for changed total value.**
Footing and foundation for a 72-unit, mixed-use wrap building around the previously permitted parking ramp. 
p217.10.13.16 11/25/2016  Approved
11/30/2016 by kschmidt
Approved
12/1/2016 by Ryan Erickson
Approved
12/9/2016 by MElshaug
N/A OK to ISSUE
1/10/2017 by Doug
217 Roberts St N  Robert Street Mixed Use-Foundation  **Sheets C100 and C200 submitted 11/18/16**
Footing and foundation for a 72-unit, mixed-use wrap building around the previously permitted parking ramp. 
p217.10.13.16 11/18/2016  Approved
11/23/2016 by kls
Fnd only
11/22/2016 by Ryan Erickson
Fnd only
11/18/2016 by MElshaug
N/A FND Issued
Needs Review
11/25/2016 by Doug
217 Roberts St N  Robert Street Mixed Use-Foundation  **Sheets C100, C200, S.01, S1.1, S3.0, S3.1, and S5.0 submitted 11/9/16**
Footing and foundation for a 72-unit, mixed-use wrap building around the previously permitted parking ramp. 
p217.10.13.16 11/9/2016  Approved
11/23/2016 by kls
Fnd only
11/14/2016 by Ryan Erickson
Fnd only
11/15/2016 by MElshaug
N/A Superseded
217 Roberts St N  Robert Street Mixed Use-Foundation  Footing and foundation for a 72-unit, mixed-use wrap building around the previously permitted parking ramp.  p217.10.13.16 10/13/2016  Approved
11/23/2016 by kschmidt
Fnd only
10/19/2016 by Ryan Erickson
Fnd only
10/20/2016 by MElshaug
N/A Superseded
11/2/2016 by Doug
1881 Sheyenne Loop N  Sheyenne Mechanical Building  Construct 24,000 square foot pole building.  p1881.1.12.17 1/12/2017  Pending
1/26/2017 by Rachel and Ron
Pending
1/13/2017 by Ryan Erickson
Pending
1/19/2017 by Barrett
N/A Reviewed-
Waiting
Response
1100 19 Ave N  Magnolia Restaurant  **Full plans submitted 1/9/17**
**Plan for fire rated walls submitted 8/3/16**
Construct a restaurant in the lease space of the existing building 
P1100.07.28.2016 1/9/2017  N/A Approved
1/9/2017 by Ryan Erickson
N/A Approved
1/19/2017 by Chris Ohman
Reviewed-
Waiting
Response
1100 19 Ave N  Magnolia Restaurant  **Plan for fire rated walls submitted 8/3/16**
Construct a restaurant in the lease space of the existing building 
P1100.07.28.2016 8/3/2016  N/A N/A N/A Approved
8/12/2016 by Chris Ohman
Superseded
10/13/2016 by CR
1100 19 Ave N  Restaurant  Construct a restaurant in the lease space of the existing building  P1100.07.28.2016 7/28/2016  N/A N/A N/A New Superseded
6159 19 Ave N  Christianson Pole Building  Construct 60'x200' pole building for use as farm storage.  p6159.12.27.16 12/27/2016  Rejected
1/5/2017 by Ron
Rejected
12/29/2016 by Ryan Erickson
Pending
12/30/2016 by Kylie Murphy
N/A Rejected
2/16/2017 by CR
3541 25 St S  25th Street Office Building  **Sheets C.01, C2.1, C4.1, and L1.1 submitted 12/27/16**
Construct one-story office building and associated site work. 
p3541.12.13.16 12/27/2016  Approved
1/5/2017 by Ron
Approved
12/27/2016 by Ryan Erickson
Approved
1/20/2017 by Voigt
N/A Ready
With
SignOffs
1/11/2017 by Doug
3541 25 St S  25th Street Office Building  Construct one-story office building and associated site work.  p3541.12.13.16 12/13/2016  Pending
12/19/2016 by Ron
Approved
12/14/2016 by Ryan Erickson
Pending
12/20/2016 by Barrett Voigt
N/A Superseded
1319 Centennial Blvd N  Dolve Hall Office Remodel  Remove and reconfigure walls for use as offices. Replace windows throughout building. Upgrade ventilation for the south bank of rooms.  p1319.12.6.16 12/6/2016  N/A N/A N/A N/A OK to ISSUE
2/14/2017 by Doug
3880 51 St S  The Lofts at 51st  **Civil plans resubmitted 11/25/16**
**Civil plans resubmitted 11/2/16**
**Civil plans and Sheets A0 and A1 submitted 10/5/16**
Footings, foundation, and site work for a 32-unit apartment building with underground parking. 
p3880.9.20.16 11/25/2016  Approved
11/30/2016 by Ron
Approved
11/30/2016 by Ryan Erickson
Fnd only
11/30/2016 by MElshaug
N/A FND Issued
Needs Review
2/13/2017 by Doug
3880 51 St S  The Lofts at 51st  **Civil plans resubmitted 11/2/16**
**Civil plans and Sheets A0 and A1 submitted 10/5/16**
Footings, foundation, and site work for a 32-unit apartment building with underground parking. 
p3880.9.20.16 11/2/2016  Pending
11/7/2016 by Ron S
Approved
11/3/2016 by Ryan Erickson
Pending
11/8/2016 by MElshaug
N/A Reviewed-
Waiting
Response
3880 51 St S  The Lofts at 51st  **Civil plans and Sheets A0 and A1 submitted 10/5/16**
Footings, foundation, and site work for a 32-unit apartment building with underground parking. 
p3880.9.20.16 10/5/2016  New Approved
10/6/2016 by Ryan Erickson
Pending
10/12/2016 by Murphy
N/A Superseded
3880 51 St S  The Lofts at 51st  Footings, foundation, and site work for a 32-unit apartment building with underground parking.  p3880.9.20.16 9/20/2016  New Approved
9/22/2016 by Ryan Erickson
Pending
9/23/2016 by KMurphy
N/A Superseded
1026 NP Ave  Historic Union Service Drive  Install a service drive on the west side of the building.  P1026.11.14.16 11/14/2016  Pending
11/17/2016 by Jason L
Approved
11/14/2016 by Ryan Erickson
Approved
11/15/2016 by MElshaug
N/A Ready
With
SignOffs
3/6/2017 by CR
510 4 St S  Prairie St. John's Offices  Convert at portion of the existing community room for use as four offices.  p510.10.27.16 10/27/2016  N/A N/A N/A N/A OK to ISSUE
11/9/2016 by Doug
3781 56 St S  Anne Carlsen Group Living  **new plans submitted changing the use from a residential use to a 6 unit apartment. 10/25/16 (CR)
**New landscaping plan submitted 7/7/16**
**New sidewalk plan submitted 6/23/16**
**New landscaping plan submitted and description below changed to include sprinkler system 6/2/16**
**Landscaping plan and lighting study submitted 4/19/16**
Construct home for use as a group living facility. 
p3781.4.15.16 10/25/2016  Pending
11/8/2016 by Ron S
Pending
11/3/2016 by Ryan Erickson
Approved
10/28/2016 by MElshaug
Rejected
10/31/2016 by Kim
Reviewed-
Waiting
Response
11/21/2016 by CR
3781 56 St S  Anne Carlsen Group Living  **New landscaping plan submitted 7/7/16**
**New sidewalk plan submitted 6/23/16**
**New landscaping plan submitted and description below changed to include sprinkler system 6/2/16**
**Landscaping plan and lighting study submitted 4/19/16**
Construct home for use as a group living facility. 
p3781.4.15.16 7/7/2016  N/A N/A Approved
7/8/2016 by MElshaug
N/A Superseded
1870 43 St N  CAM LLC  **New plans submitted 10/21/16**
**Sheets C2.0, C2.1, C3.0, and C3.1 submitted 10/11/16**
Foundation, site work, and associated parking lot for new office building.
**Address changed from 4300 19 Ave N**
All work above the foundation will require additional plan reviews and permits. 10-7-16 (CR) 
p4300.9.29.16 10/21/2016  Approved
10/31/2016 by Ron
Approved
10/24/2016 by Ryan Erickson
Fnd only
11/2/2016 by MElshaug
N/A Ready
With
SignOffs
11/7/2016 by Doug
1870 43 St N  CAM LLC  **Sheets C2.0, C2.1, C3.0, and C3.1 submitted 10/11/16**
Foundation, site work, and associated parking lot for new office building.
**Address changed from 4300 19 Ave N**
All work above the foundation will require additional plan reviews and permits. 10-7-16 (CR) 
p4300.9.29.16 10/11/2016  Pending
10/19/2016 by Ron S.
Approved
10/11/2016 by Ryan Erickson
Pending
10/17/2016 by Barrett Voigt
N/A Superseded
1870 43 St N  CAM LLC  Foundation, site work, and associated parking lot for new office building.
**Address changed from 4300 19 Ave N**
All work above the foundation will require additional plan reviews and permits. 10-7-16 (CR) 
p4300.9.29.16 9/29/2016  Pending
10/7/2016 by Ron S
Pending
9/30/2016 by Ryan Erickson
Pending
10/11/2016 by Barrett Voigt
N/A Superseded
4000 58 Ave S  Maplewood Estates Building 2  **Plans for this building were included in the routing for 5880 41 St S.**
**New site & landscaping plans submitted 9/13/16**
**New landscaping plans submitted 8/24/16**
Construct a new 47 unit apartment building 
P4000.07.29.16 10/21/2016  Approved
10/26/2016 by Ron
Approved
10/25/2016 by Ryan Erickson
Approved
10/25/2016 by MElshaug
N/A Reviewed-
Waiting
Response
4000 58 Ave S  Maplewood Estates Building 2  **New site & landscaping plans submitted 9/13/16**
**New landscaping plans submitted 8/24/16**
Construct a new 47 unit apartment building 
P4000.07.29.16 9/13/2016  Pending
9/19/2016 by Ron S.
Approved
9/16/2016 by Ryan Erickson
Approved
10/17/2016 by MElshaug
N/A Superseded
4000 58 Ave S  Maplewood Estates Building 2  **New landscaping plans submitted 8/24/16**
Construct a new 47 unit apartment building 
P4000.07.29.16 8/24/2016  Pending
8/25/2016 by Ron S.
New New N/A Superseded
4000 58 Ave S  Maplewood Estates Building 2  Construct a new 47 unit apartment building  P4000.07.29.16 7/29/2016  New Pending
8/3/2016 by Ryan Erickson
Pending
8/5/2016 by Barrett Voigt
N/A Superseded
5400 63 St S  Fargo Recycling Drop Site  **New site plans submitted 10/17/16**
Construct driveway, parking lot, and fence for recycling containers. 
p5400.10.5.16 10/17/2016  Approved
10/24/2016 by Ron
Approved
10/18/2016 by Ryan Erickson
Approved
10/26/2016 by Barrett Voigt
N/A OK to ISSUE
10/31/2016 by CR
5400 63 St S  Fargo Recycling Drop Site  Construct driveway, parking lot, and fence for recycling containers.  p5400.10.5.16 10/5/2016  Pending
10/10/2016 by Ron S.
Approved
10/6/2016 by Ryan Erickson
Pending
10/17/2016 by Barrett Voigt
N/A Superseded
5880 41 St S  Maplewood Estates Building 1  **Sheets C1-C10 submitted 10/11/16**
**New site & landscaping plans submitted 9/13/16**
**New landscaping plans submitted 8/24/16**
Construct a new 47 unit apartment building 
P5880.07.29.16 10/11/2016  Approved
10/19/2016 by Ron
Approved
10/11/2016 by Ryan Erickson
Approved
10/17/2016 by MElshaug
N/A Reviewed-
Waiting
Response
5880 41 St S  Maplewood Estates Building 1  **New site & landscaping plans submitted 9/13/16**
**New landscaping plans submitted 8/24/16**
Construct a new 47 unit apartment building 
P5880.07.29.16 9/13/2016  Pending
9/19/2016 by Ron S.
Approved
9/16/2016 by Ryan Erickson
New N/A Superseded
5880 41 St S  Maplewood Estates Building 1  **New landscaping plans submitted 8/24/16**
Construct a new 47 unit apartment building 
P5880.07.29.16 8/24/2016  Pending
9/19/2016 by Ron
New New N/A Superseded
5880 41 St S  Maplewood Estates Building 1  Construct a new 47 unit apartment building  P5880.07.29.16 7/29/2016  New Pending
8/3/2016 by Ryan Erickson
Pending
8/5/2016 by Barrett Voigt
N/A Superseded
5195 45 St S  Office & Bank Building  **Building shell and interior fit-up plans submitted 9/1/16**
**Sheets C1.1, C2.2, C3.1, C5.1, C5.2, and L1.1 resubmitted 9/1/16**
Foundation and site work only for new office building. 
p5195.8.5.16 9/1/2016  Approved
9/20/2016 by Jason
Approved
9/7/2016 by Ryan Erickson
Approved
9/15/2016 by ANelson
N/A Reviewed-
Waiting
Response
5195 45 St S  Office & Bank Building  **Sheets C1.1, C2.2, C3.1, C5.1, C5.2, and L1.1 resubmitted 9/1/16**
Foundation and site work only for new office building. 
p5195.8.5.16 9/1/2016  New New New N/A Superseded
5195 45 St S  Office & Bank Building  Foundation and site work only for new office building.  p5195.8.5.16 8/5/2016  Pending
8/10/2016 by Ron S
Approved
8/9/2016 by Ryan Erickson
New N/A Superseded
4801 Timber Parkway South  Timber Parkway Development  Site grading and LOMR only.  P4801.09.26.2016 9/26/2016  Approved
9/29/2016 by Jason L
Approved
9/28/2016 by Ryan Erickson
Pending
10/7/2016 by MElshaug
N/A Need signoffs-
No Permit
Required
11/21/2016 by CR
4955 30 Ave S  The Retreat III at Urban Plains  Construct 4-story, 45-unit apartment building with at-grade parking, attached clubhouse and leasing office, and associated site work. Builder is requesting FOUNDATION ONLY APPROVAL at this time.  p4955.8.18.16 8/18/2016  Pending
8/25/2016 by Ron S
Approved
8/24/2016 by Ryan Erickson
Pending
8/30/2016 by Murphy
N/A Ready
With
SignOffs
11/14/2016 by CR
401 43 1/2 St S  Roers Parking Lot Expansion  Relocate existing retention pond and expand existing parking lot.  p401.8.15.16 8/15/2016  Approved
11/21/2016 by Brenda
Approved
8/22/2016 by Ryan Erickson
Approved
11/17/2016 by ANelson
N/A Ready
With
SignOffs
10/3/2016 by CR
4820 30 Ave S  Baby Bloomers  Remodel space in existing building for use as a daycare.  p4820.7.26.16 7/26/2016  N/A N/A Approved
8/15/2016 by MElshaug
Approved
8/3/2016 by Kim
Reviewed-
Waiting
Response
12/7/2016 by Doug
602 43 St N  Wadeson Properties Phase 2  Construct pre-engineered metal building for use as multi-tenant storage or shop spaces.  p602b.4.20.16 4/20/2016  Pending
5/2/2016 by Ron S
Pending
6/20/2016 by Ryan Erickson
Pending
5/2/2016 by MRude
N/A OK to Issue
FND only
W-SignOffs
602 43 St N  Wadeson Properties Phase 1  Construct pre-engineered metal building for use as multi-tenant storage or shop spaces.  p602a.4.20.16 4/20/2016  Pending
5/2/2016 by Ron S.
Pending
6/20/2016 by Ryan Erickson
Pending
5/2/2016 by MRude
N/A OK to Issue
FND only
W-SignOffs
3554 4 Ave S  Shannon Enterprises Cold Storage  **new plan submitted 04-06-16 (CR)
**Sheet C1.0 and hydrology resubmitted 4/1/16**
**Sheet C1.0 resubmitted 1/15/16**
**new plan submitted 01-07-16 (CR)
**Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 4/8/2016  Approved
5/17/2016 by Ron
Approved
4/12/2016 by Ryan Erickson
Fnd only
4/13/2016 by MRude
N/A Ready
With
SignOffs
5/13/2016 by Doug
3554 4 Ave S  Shannon Enterprises Cold Storage  **Sheet C1.0 and hydrology resubmitted 4/1/16**
**Sheet C1.0 resubmitted 1/15/16**
**new plan submitted 01-07-16 (CR)
**Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 4/1/2016  Pending
4/7/2016 by Ron S.
Approved
4/1/2016 by Ryan Erickson
Pending
4/7/2016 by MRude
N/A Ready
With
SignOffs
3554 4 Ave S  Shannon Enterprises Cold Storage  **Sheet C1.0 resubmitted 1/15/16**
**new plan submitted 01-07-16 (CR)
**Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 1/15/2016  Pending
1/20/2016 by Ron S.
Approved
1/19/2016 by Ryan Erickson
New N/A Superseded
1/15/2016 by Doug
3554 4 Ave S  Shannon Enterprises Cold Storage  **new plan submitted 01-07-16 (CR)
**Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 1/8/2016  Pending
1/12/2016 by Ron S.
Approved
1/11/2016 by Ryan Erickson
Pending
1/12/2016 by MRude
N/A Superseded
3554 4 Ave S  Shannon Enterprises Cold Storage  **Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 12/23/2015  Pending
1/5/2016 by Ron S.
Pending
12/29/2015 by Ryan Erickson
New N/A Superseded
1819 3 Ave N  IDC Builders  Construct a manufacturing/office facility  P1819.04.05.16 4/5/2016  Pending
4/14/2016 by Ron S
Approved
4/6/2016 by Ryan Erickson
Pending
4/22/2016 by MRude
N/A Reviewed-
Waiting
Response
12/20/2016 by CR
1720 University Dr S  Sanford South Podiatry Remodel  Remodel portion of fourth floor for exam rooms and support space.  p1720.3.3.16 3/3/2016  N/A N/A N/A N/A OK to ISSUE