Inspections Department - Plan Routing

City of Fargo Intranet - Plan Routing

Plan Routing

Plans listed as rejected need to be amended / modified and submitted for further review.

Address Project Title Description Project Date Eng. Fire Plan. Hlth. Status
4170 Great Plains Dr S  Woodhaven Office Building  Construct new office complex.  P41702.9.16 2/9/2016  PendingPendingPendingN/A NEW
4801 45 St S  Dollar Tree Building  Plans for retail building shell only on previously routed site. ** Civil/site plans submitted for building construction clarification. Interior plans also submitted on 1/28/16 for interior fit-up of shell building. 2/8/16- BT. **  p4801.1.29.16 2/9/2016  PendingApproved
2/9/2016
PendingN/A NEW
4801 45 St S  Dollar Tree Building  Plans for retail building shell only on previously routed site.  p4801.1.29.16 1/29/2016  PendingApproved
2/2/2016
Pending
2/4/2016
N/A Rvwd W-R
1303 University Dr N  Alpha Gamma Rho  Concrete paving, landscaping, flagpoles, seat walls, lighting, and irrigation.  P1303.2.9.16 2/9/2016  PendingApproved
2/9/2016
PendingN/A NEW
5300 32 Ave S  Fargo Booster Pump Station  **Addendum for Project WA1501 received 2/4/16**
Construct booster pump station, including 31'x45' building and sitework. 
p5300.1.26.16 2/4/2016  Approved
2/10/2016
Approved
2/8/2016
Approved
2/10/2016
N/A Rvwd W-R
5300 32 Ave S  Fargo Booster Pump Station  Construct booster pump station, including 31'x45' building and sitework.  p5300.1.26.16 1/26/2016  PendingApproved
1/27/2016
Pending
2/4/2016
N/A Rvwd W-R
1423 35 St S  AmericInn Pool Remodel  Remove and replace swimming pool and surrounding deck. Convert existing sauna to pool equipment room.  p1423.2.3.16 2/3/2016  N/AN/AN/APending NEW
4004 33 St N  West Central Addition  **Sheets C-4, C-8, and C-9 resubmitted 2-3-16**
Construct addition for three loading docks and add storm retention to lot. 
p4004.1.14.16 2/3/2016  Approved
2/9/2016
Pending
2/3/2016
PendingN/A Review I-P
4004 33 St N  West Central Addition  Construct addition for three loading docks and add storm retention to lot.  p4004.1.14.16 1/14/2016  Pending
1/21/2016
Pending
1/19/2016
Pending
1/27/2016
N/A Superseded
5635 14 Ave N  Storm Improvement District #4054 Phase II  Construct storm sewer lift station and building.  p5635.2.2.16 2/2/2016  Approved
2/11/2016
Approved
2/3/2016
PendingN/A NEW
4002 17 Ave S  Hawthorn Suites by Wyndham  **Sheets C1-C10 resubmitted 2/2/16**
**New Sheets L1 & L2 submitted 1-8-16*
**new plans submitted 12-30-15 (CR)
**New building plans submitted 12/8/15**
**New civil & site plans, Sheet C1-C10, resubmitted 11/3/15**
***Full sets of all pages resubmitted 10/26/15, along withCOMcheck.***
Construct a new 4 story hotel. contractor requesting foundation only at this time.  
P4002.09.10.15 2/2/2016  Approved
2/2/2016
Approved
2/4/2016
Approved
2/4/2016
Approved
2/4/2016
Permitted
4002 17 Ave S  Hawthorn Suites by Wyndham  **New Sheets L1 & L2 submitted 1-8-16*
**new plans submitted 12-30-15 (CR)
**New building plans submitted 12/8/15**
**New civil & site plans, Sheet C1-C10, resubmitted 11/3/15**
***Full sets of all pages resubmitted 10/26/15, along withCOMcheck.***
Construct a new 4 story hotel. contractor requesting foundation only at this time.  
P4002.09.10.15 1/8/2016  Pending
1/11/2016
Approved
1/11/2016
Approved
1/8/2016
Approved
1/27/2016
Ready
W-SignOffs
4002 17 Ave S  Hawthorn Suites by Wyndham  **new plans submitted 12-30-15 (CR)
**New building plans submitted 12/8/15**
**New civil & site plans, Sheet C1-C10, resubmitted 11/3/15**
***Full sets of all pages resubmitted 10/26/15, along withCOMcheck.***
Construct a new 4 story hotel. contractor requesting foundation only at this time.  
P4002.09.10.15 12/30/2015  Pending
1/11/2016
Approved
1/4/2016
Pending Approved
1/5/2016
FND Issued
W-R
4002 17 Ave S  Hawthorn Suites by Wyndham  **New building plans submitted 12/8/15**
**New civil & site plans, Sheet C1-C10, resubmitted 11/3/15**
***Full sets of all pages resubmitted 10/26/15, along withCOMcheck.***
Construct a new 4 story hotel. contractor requesting foundation only at this time.  
P4002.09.10.15 12/8/2015  Approved
12/8/2015
Approved
12/10/2015
Fnd only
12/14/2015
Approved
1/5/2016
FND Issued
W-R
4002 17 Ave S  Hawthorn Suites by Wyndham  **New civil & site plans, Sheet C1-C10, resubmitted 11/3/15**
***Full sets of all pages resubmitted 10/26/15, along withCOMcheck.***
Construct a new 4 story hotel. contractor requesting foundation only at this time.  
P4002.09.10.15 11/3/2015  Approved
11/5/2015
Approved
11/4/2015
Fnd only
11/4/2015
Approved
11/5/2015
FND Issued
W-R
4002 17 Ave S  Hawthorn Suites by Wyndham  ***Full sets of all pages resubmitted 10/26/15, along withCOMcheck.***
Construct a new 4 story hotel. contractor requesting foundation only at this time.  
P4002.09.10.15 10/26/2015  Pending
10/29/2015
Pending
10/29/2015
Pending Fnd only
10/27/2015
NEW
4002 17 Ave S  Hawthorn Suites by Wyndham  Construct a new 4 story hotel. contractor requesting foundation only at this time.   P4002.09.10.15 9/10/2015  Pending
9/30/2015
Pending
9/11/2015
Pending
9/25/2015
Fnd only
9/21/2015
OK to Issue
FND only
W-SignOffs
4151 38 St S  S & D Management Remodel  Remodel offices in Suite C.  p4151.2.2.16 2/2/2016  N/AN/AN/AN/A Permitted
5050 30 Ave S & 5074 28 Ave S  Urban Plains Park  Build park on 5050 30 Ave S and 5074 28 Ave S. Work to include shelters, gazebo, restrooms, bike storage/rental, and concessions.  p5050.2.2.16 2/2/2016  PendingApproved
2/2/2016
Pending Approved
2/10/2016
Rvwd W-R
64 4 St N  Loudon Building Renovations  Remodel existing office building, including the addition of exit stairs, elevator, and restrooms for future fit-ups. Construct parking lot.  p64.2.1.16 2/1/2016  Pending
2/11/2016
Approved
2/2/2016
Pending
2/5/2016
N/A NEW
3901 40 Ave S  FPS Operations Center  **Landscaping plan resubmitted 1/28/16**
Construct 66,681 SF new building to include kitchen, printing area, storage, office space, and carpentry and mechanic shops. 
p3901.1.12.16 1/29/2016  Approved
2/9/2016
Approved
2/1/2016
Pending
2/4/2016
Approved
2/1/2016
Review I-P
3901 40 Ave S  FPS Operations Center  Construct 66,681 SF new building to include kitchen, printing area, storage, office space, and carpentry and mechanic shops.  p3901.1.12.16 1/12/2016  Pending
2/8/2016
Approved
1/15/2016
Pending
1/21/2016
Approved
1/20/2016
NEW
4801 45 St S  Eagle Ridge Private Drive  Construct private drive on lots 4801, 4821, 4861, and 4891 45th Street South and 4800 and 4850 46th Street South.  p4801.1.27.16 1/27/2016  PendingPending
1/27/2016
Approved
2/3/2016
N/A No Permit
Required
4974 30 Ave S  Encore Apartments Phase 1 Building 2  **Full new plans for building and site submitted 1/25/16**
**Sheets C2, C3, C4, and C8 resubmitted 11/6/15**
**New building and development plans submitted 11/3/15. Builder is requesting foundation only at this time.**
Construct a new 54 unit apartment building with associated garages 
P4974.10.08.15 1/25/2016  Approved
1/28/2016
Approved
1/26/2016
Approved
2/3/2016
N/A Rvwd W-R
4974 30 Ave S  Encore Apartments Phase 1 Building 2  **Sheets C2, C3, C4, and C8 resubmitted 11/6/15**
**New building and development plans submitted 11/3/15. Builder is requesting foundation only at this time.**
Construct a new 54 unit apartment building with associated garages 
P4974.10.08.15 11/6/2015  Approved
12/3/2015
Approved
11/9/2015
Fnd only
11/13/2015
N/A Rvwd W-R
4974 30 Ave S  Encore Apartments Phase 1 Building 2  **New building and development plans submitted 11/3/15. Builder is requesting foundation only at this time.**
Construct a new 54 unit apartment building with associated garages 
P4974.10.08.15 11/3/2015  Pending
11/4/2015
Approved
11/4/2015
PendingN/A NEW
4974 30 Ave S  Encore Apartments Phase 1 Building 2  Construct a new 54 unit apartment building with associated garages  P4974.10.08.15 10/8/2015  Pending
10/28/2015
Approved
10/12/2015
Pending
10/19/2015
N/A NEW
1222 4 Ave N  Woodrow Wilson NE Building  **New civil, landscaping, and floor plans submitted 1/21/16**
**New full plans submitted 11-23-15**
**new plan submitted 08-24-15 (CR)
Construct a 4 story apartment building with underground parking. Foundation Only requested at this time. 
P1222.8.18.15 1/21/2016  Approved
1/27/2016
Approved
1/21/2016
Approved
2/3/2016
N/A Ready
W-SignOffs
1222 4 Ave N  Woodrow Wilson NE Building  **New full plans submitted 11-23-15**
**new plan submitted 08-24-15 (CR)
Construct a 4 story apartment building with underground parking. Foundation Only requested at this time. 
P1222.8.18.15 11/23/2015  Pending
11/24/2015
Approved
11/24/2015
Pending
11/27/2015
N/A Superseded
1222 4 Ave N  Woodrow Wilson NE Building  **new plan submitted 08-24-15 (CR)
Construct a 4 story apartment building with underground parking. Foundation Only requested at this time. 
P1222.8.18.15 8/24/2015  Pending
8/27/2015
Fnd only
8/25/2015
Pending
8/26/2015
N/A Superseded
1222 4 Ave N  Woodrow Wilson NE Building  Construct a 4 story apartment building with underground parking. Foundation Only requested at this time.  P1222.8.18.15 8/18/2015  PendingFnd only
8/19/2015
PendingN/A Superseded
2401 41 St S  41st Street Medical Building  **Building plans submitted 1/21/16**
**Sheets R1 C2.0 and R2 C2.0 resubmitted 11/17/15**
**Address changed from 4100 24 Ave S**
REQUESTING FOUNDATION ONLY AT THIS TIME
Construct new building for same-day medical procedures and physical therapy. 
p4100.11.12.15 1/21/2016  Approved
1/22/2016
Approved
1/21/2016
Approved
2/2/2016
Approved
1/27/2016
Rvwd W-R
2401 41 St S  41st Street Medical Building  **Sheets R1 C2.0 and R2 C2.0 resubmitted 11/17/15**
**Address changed from 4100 24 Ave S**
REQUESTING FOUNDATION ONLY AT THIS TIME
Construct new building for same-day medical procedures and physical therapy. 
p4100.11.12.15 11/17/2015  Approved
11/20/2015
Approved
11/18/2015
Fnd only
11/18/2015
Approved
11/18/2015
FND issued
Needs Bldg
ReRouted
2401 41 St S  41st Street Medical Building  **Address changed from 4100 24 Ave S**
REQUESTING FOUNDATION ONLY AT THIS TIME
Construct new building for same-day medical procedures and physical therapy. 
p4100.11.12.15 11/12/2015  Pending
11/13/2015
Approved
11/13/2015
Pending Approved
11/13/2015
NEW
5680 23 Ave S  Tobacco City Fit-Up  **New plans submitted 1/15/16**
Fit up lease space for retail store 
p5680.1.5.16 1/15/2016  N/AN/AN/AN/A Permitted
5680 23 Ave S  Tobacco City Fit-Up  Fit up lease space for retail store  p5680.1.5.16 1/5/2016  N/AN/AN/AN/A Rvwd W-R
5475 51 Ave S  Personal Training Facility  **Sheet C1.1 resubmitted 1/15/16**
Re-fit existing metal building for use as a gym. 
p5475.1.11.16 1/15/2016  N/AN/AApproved
1/20/2016
N/A Permitted
5475 51 Ave S  Personal Training Facility  Re-fit existing metal building for use as a gym.  p5475.1.11.16 1/11/2016  N/AN/APending
1/14/2016
N/A Rvwd W-R
2600 52 Ave S  Urban Edge Salon Expansion  **New plan submitted 1/15/16**
Expand existing salon into neighboring lease space. 
p2600.1.13.16 1/15/2016  N/AN/AN/A Approved
1/20/2016
Permitted
2600 52 Ave S  Urban Edge Salon Expansion  Expand existing salon into neighboring lease space.  p2600.1.13.16 1/13/2016  N/AN/AN/A Approved
1/14/2016
Superseded
3554 4 Ave S  Shannon Enterprises Cold Storage  **Sheet C1.0 resubmitted 1/15/16**
**new plan submitted 01-07-16 (CR)
**Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 1/15/2016  Pending
1/20/2016
Approved
1/19/2016
PendingN/A Ready
W-SignOffs
3554 4 Ave S  Shannon Enterprises Cold Storage  **new plan submitted 01-07-16 (CR)
**Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 1/8/2016  Pending
1/12/2016
Approved
1/11/2016
Pending
1/12/2016
N/A Rvwd W-R
3554 4 Ave S  Shannon Enterprises Cold Storage  **Changed address from 3522 4 Ave S per W. Lorsbough 12/28/15**
Construct 48' x 64' cold storage building. 
p3522.12.23.15 12/23/2015  Pending
1/5/2016
Pending
12/29/2015
PendingN/A Rvwd W-R
614 Main Ave  Investments on Main Remodel  **New sheet A1.0 and A1.1 submitted 1/14/16**
Remodel interior, including electrical and mechanical, build upper level deck on rear, and replace storefront on existing building. 
p614.11.2.15 1/14/2016  N/AN/AApproved
1/25/2016
N/A Permitted
614 Main Ave  Investments on Main Remodel  Remodel interior, including electrical and mechanical, build upper level deck on rear, and replace storefront on existing building.  p614.11.2.15 11/2/2015  N/AN/AApproved
11/16/2015
N/A Rvwd W-R
3803 Main Ave N  Hannahers  **Full plan resubmittal 1/14/16**
**Resubmittal of sheet C2.0 with an updated hydrant plan. 9.17.15 JDS**
Construct a new Metal building for office furiture showroom,office,warehouse space 
P3803.09.10.15 1/14/2016  Pending
1/28/2016
Approved
1/15/2016
Pending
1/22/2016
N/A NEW
3803 Main Ave N  Hannahers  **Resubmittal of sheet C2.0 with an updated hydrant plan. 9.17.15 JDS**
Construct a new Metal building for office furiture showroom,office,warehouse space 
P3803.09.10.15 9/17/2015  Pending
9/22/2015
Approved
9/17/2015
Pending
10/1/2015
N/A Rvwd W-R
3803 Main Ave N  Hannahers  Construct a new Metal building for office furiture showroom,office,warehouse space  P3803.09.10.15 9/10/2015  Pending
11/9/2015
Pending
9/11/2015
PendingN/A Superseded
4035 19 Ave N  AES Veterinary Diagnostic Lab  **Address updated from 4301 19 Ave N 1/15/16**
25,211 SF new building for use as a laboratory facility. 
p4301.1.12.16 1/12/2016  Pending
1/26/2016
Pending
1/13/2016
Pending
2/1/2016
N/A Rvwd W-R
5180 Prosperity Way  Timber Creek Office  **Sheets C1.1, C2.1, C3.1, C5.1, and L1.1 resubmitted 1/11/16**
**Sheets C1.1, L1.1, and A3.1 resubmitted 12/23/15**
**Sheet A3.1 resubmitted 12/4/15**
**Sheets C1.1, C2.1, C2.3, C5.1, and L1.1 submitted 11/30/15**
Construct a new office building 
P5180.11.03.15 1/11/2016  Approved
1/19/2016
Approved
1/12/2016
Approved
1/19/2016
N/A Permitted
5180 Prosperity Way  Timber Creek Office  **Sheets C1.1, L1.1, and A3.1 resubmitted 12/23/15**
**Sheet A3.1 resubmitted 12/4/15**
**Sheets C1.1, C2.1, C2.3, C5.1, and L1.1 submitted 11/30/15**
Construct a new office building 
P5180.11.03.15 12/23/2015  Fnd only
12/23/2015
Approved
12/28/2015
Fnd only
12/24/2015
N/A FND Issued
Ready with
SignOffs
5180 Prosperity Way  Timber Creek Office  **Sheet A3.1 resubmitted 12/4/15**
**Sheets C1.1, C2.1, C2.3, C5.1, and L1.1 submitted 11/30/15**
Construct a new office building 
P5180.11.03.15 12/4/2015  Fnd only
12/10/2015
Approved
12/7/2015
Fnd only
12/10/2015
N/A FND Issued
Ready with
SignOffs
5180 Prosperity Way  Timber Creek Office  **Sheets C1.1, C2.1, C2.3, C5.1, and L1.1 submitted 11/30/15**
Construct a new office building 
P5180.11.03.15 11/30/2015  Fnd only
12/10/2015
Approved
11/30/2015
Fnd only
12/3/2015
N/A Ready
W-SignOffs
5180 Prosperity Way  Timber Creek Office  Construct a new office building  P5180.11.03.15 11/3/2015  Pending
11/25/2015
Approved
11/5/2015
Pending
11/16/2015
N/A Ready
W-SignOffs
6159 19 Ave N  Scott Christianson Farms Storage Buildings  **new plan submitted 01-11-16 (CR)
Customer changed the plan and will only be construction one building.
Construct 2 pole buildings for AG storage. 
P6159.8.5.15 1/11/2016  Pending
1/14/2016
Pending
1/15/2016
Pending
1/14/2016
N/A NEW
6159 19 Ave N  Scott Christianson Farms Storage Buildings  Construct 2 pole buildings for AG storage.  P6159.8.5.15 8/5/2015  Rejected
1/13/2016
Approved
8/10/2015
Pending
9/3/2015
N/A Review I-P
221 19 St N  New Life Center Thrift Store  Remodel warehouse for use as thrift store and staging area. Work to include demising wall, vestibule, and restrooms.  p221.1.8.16 1/8/2016  N/AN/APending
2/11/2016
N/A Rvwd W-R
2970 Calico Dr S  Crestwood Condos Building 5  **New civil plans (all sheets) submitted 1/6/16**
Build a two-story condo building with 8 units. There will be six buildings on the site. 
p2970.12.10.15 1/6/2016  Pending
1/13/2016
Approved
1/7/2016
Pending
1/11/2016
N/A Rvwd W-R
2970 Calico Dr S  Crestwood Condos Building 6  Build a two-story condo building with 8 units. There will be six buildings on the site.  p2970.12.10.15 12/10/2015  Pending
12/23/2015
Approved
12/17/2015
Pending
12/17/2015
N/A Rvwd W-R
2990 Calico Dr S  Crestwood Condos Building Building 6  **Address and building number updated per Roers.**
**New civil plans (all sheets) submitted 1/6/16**
Build a two-story condo building with 8 units. There will be six buildings on the site. 
p2860.12.10.15 1/6/2016  Pending
1/13/2016
Pending
1/7/2016
Pending
1/11/2016
N/A Rvwd W-R
2860 Calico Dr S  Crestwood Condos Building Building 1  Build a two-story condo building with 8 units. There will be six buildings on the site.  p2860.12.10.15 12/10/2015  Pending
12/23/2015
Pending
12/17/2015
Pending
12/17/2015
N/A Rvwd W-R
1431 Albrecht Blvd N  Reed Hall Bathrooms Phase 2  Remodel the remaining bathrooms, replace plumbing, and rough-in for future fire sprinkler system on all four floors.  p1431.1.5.16 1/5/2016  N/AN/AN/AN/A Rvwd W-R
6219 53 Ave S  Greenscapes Companies Inc  **New planting plan submitted 12/28/15**
**New Sheet C1 resubmitted 12/4/15**
**New Sheets C1-C9 resubmitted 11/17/15**
New building to include shop and office areas for landscaping company; construct new parking lot and paved storage area. 
p6219.11.2.15 12/28/2015  Approved
1/5/2016
Approved
12/28/2015
Approved
12/29/2015
N/A Review I-P
6219 53 Ave S  Greenscapes Companies Inc  **New Sheet C1 resubmitted 12/4/15**
**New Sheets C1-C9 resubmitted 11/17/15**
New building to include shop and office areas for landscaping company; construct new parking lot and paved storage area. 
p6219.11.2.15 12/4/2015  Approved
12/7/2015
Approved
12/7/2015
Fnd only
12/10/2015
N/A Superseded
6219 53 Ave S  Greenscapes Companies Inc  **New Sheets C1-C9 resubmitted 11/17/15**
New building to include shop and office areas for landscaping company; construct new parking lot and paved storage area. 
p6219.11.2.15 11/17/2015  Approved
11/20/2015
Approved
11/18/2015
Fnd only
11/30/2015
N/A Superseded
6219 53 Ave S  Greenscapes Companies Inc  New building to include shop and office areas for landscaping company; construct new parking lot and paved storage area.  p6219.11.2.15 11/2/2015  Pending
11/12/2015
Approved
11/4/2015
Pending
11/13/2015
N/A Superseded
3803 13 Ave S  Holiday Inn Remodel  Add sprinklers to hotel rooms, remodel all banquet rooms and employee restrooms in lower level.  p3803.12.23.15 12/23/2015  N/AN/AN/A Approved
12/23/2015
Rvwd W-R
2303 Main Ave  Verizon Colocation  Install equipment shelter and ancillary equipment for 12 new antennas on existing tower.  p2303.12.21.15 12/21/2015  Approved
12/30/2015
Approved
12/28/2015
Rejected
1/11/2016
N/A Ready
W-SignOffs
5200 51 Ave S  Great Plains Integrated Marketing  Add a concrete pad for a future radio tower.   P5226.12.11.15 12/11/2015  PendingApproved
12/16/2015
Pending
12/18/2015
N/A Rvwd W-R
855 45 St S  Passage to India Expansion  Open wall between two lease spaces to expand seating for existing restaurant.  p855.12.11.15 12/11/2015  N/AN/AN/A Approved
12/14/2015
Abandoned
3902 13 Ave S  Helzberg Diamonds Remodel  **Revised drawings submitted 12/10/15**
Remodel lease space 342 for existing tenant, including storefront, walls, and fixtures. 
p3903.11.13.15 12/10/2015  N/AN/AN/AN/A OK to ISSUE
3902 13 Ave S  Helzberg Diamonds Remodel  Remodel lease space 342 for existing tenant, including storefront, walls, and fixtures.  p3903.11.13.15 11/13/2015  N/AN/AN/AN/A Rvwd W-R
222 Broadway N  Dempsey's Expansion  Create access between neighboring buildings to link existing portions of lounge.  p222.12.9.15 12/9/2015  N/AN/AApproved
1/21/2016
N/A NEW
2400 32 Ave S  Sanford Pediatric Therapy Remodel  Remodel existing, 2nd floor clinic space for outpatient treatment and support spaces.  p2400.12.8.15 12/8/2015  N/AN/AN/AN/A OK to ISSUE
213 NP Ave  Bortnem Family Parking Lot  **new plan submitted 12-04-15 CR
Demolish a portion of the existing building to create a parking lot.  
P213.11.05.15 12/4/2015  Approved
12/4/2015
Approved
12/7/2015
Pending
12/10/2015
N/A Ready
W-SignOffs
213 NP Ave  Bortnem Family Parking Lot  Demolish a portion of the existing building to create a parking lot.   P213.11.05.15 11/5/2015  Approved
11/12/2015
Approved
11/5/2015
Pending
11/16/2015
N/A Ready
W-SignOffs
4725 Amber Valley Pkwy S  Chipmunks Academy  Remodel existing space for new tenant. Use to be as a daycare facility.  p4725.12.3.15 12/3/2015  N/AN/AN/A Approved
12/31/2015
OK to ISSUE
4920 30 Ave S  Encore Apartments Phase 1 Building 1  **Sheets C002, C004, C009, G001, A201B, A202A & B, A203A & B, and A501 resubmitted 11/30/15**
**Sheets C2, C3, C4, and C8 resubmitted 11/6/15**
**New building and development plans submitted 11/3/15. Builder is requesting foundation only at this time.**
Construct a 54 unit apartment with associated garages.  
P4920.10.08.15 11/30/2015  Approved
12/3/2015
Approved
11/30/2015
Approved
12/28/2015
N/A OK to Issue
FND only
W-SignOffs
4920 30 Ave S  Encore Apartments Phase 1 Building 1  **Sheets C2, C3, C4, and C8 resubmitted 11/6/15**
**New building and development plans submitted 11/3/15. Builder is requesting foundation only at this time.**
Construct a 54 unit apartment with associated garages.  
P4920.10.08.15 11/6/2015  Pending
11/12/2015
Approved
11/9/2015
Fnd only
11/13/2015
N/A OK to Issue
FND only
W-SignOffs
4920 30 Ave S  Encore Apartments Phase 1 Building 1  **New building and development plans submitted 11/3/15. Builder is requesting foundation only at this time.**
Construct a 54 unit apartment with associated garages.  
P4920.10.08.15 11/3/2015  Pending
11/4/2015
Approved
11/4/2015
PendingN/A OK to Issue
FND only
W-SignOffs
4920 30 Ave S  Encore Apartments Phase 1 Building 1  Construct a 54 unit apartment with associated garages.   P4920.10.08.15 10/8/2015  Pending
10/28/2015
Approved
10/12/2015
PendingN/A Rvwd W-R
4273 Coventry Drive S  Paula Rae Community Homes  **new plan submitted 11-05-15 (CR)
Construct nine homes on one lot.  
P4273.10.16.15 11/5/2015  Approved
11/10/2015
Approved
11/9/2015
Approved
11/10/2015
N/A On Hold
4273 Coventry Drive S  Paula Rae Community Homes  Construct nine homes on one lot.   P4273.10.16.15 10/16/2015  Approved
10/21/2015
Approved
10/20/2015
Pending
10/21/2015
N/A Superseded
1400 Centennial Blvd N  Family Life Center Repairs  Replace roof and repair roof and masonry as needed.  p1400.11.3.15 11/3/2015  N/AN/AN/AN/A OK to ISSUE
3625 Lincoln St S  Olson Office Park Phase II  ***Photometric site plan submitted 10/22/15***
Construct a 7,220 sf slab on grade office building. 
P3625.8.11.15 10/22/2015  N/AN/AApproved
11/19/2015
N/A Shell Issued
WR 
3625 Lincoln St S  Olson Office Park Phase II  Construct a 7,220 sf slab on grade office building.  P3625.8.11.15 8/11/2015  Approved
8/24/2015
Approved
8/12/2015
Fnd only
8/14/2015
N/A OK to Issue
FND only
W-SignOffs
5675 26 Ave S   Home Federal Bank - Canopy  Construct a free standing canopy and drive up lanes to the existing building  P5675.10.07.15 10/7/2015  Approved
10/12/2015
Approved
10/8/2015
Approved
11/2/2015
N/A OK to ISSUE
637 NP Ave N  Fire Station No. 1 Remodel and Addition  Interior remodel and museum addition to Fargo Fire Station No. 1. Work includes asbestos abatement, updating mechanical and electrical systems, adding an elevator and repurposing the office space.  P637.9.30.15 9/30/2015  Approved
12/10/2015
Approved
10/2/2015
Approved
1/7/2016
N/A Shell Issued
WR 
5302 51 Ave S  Brookstone Properties  Construct an addition to the existing storage building.   P5302.09.23.15 9/23/2015  Approved
10/2/2015
Approved
9/24/2015
Pending
10/7/2015
N/A Rvwd W-R
5201 42 St S  Western State Bank  Construct a 2 story bank.  P5201.9.17.15 9/17/2015  Pending
9/30/2015
Approved
9/21/2015
Pending
10/1/2015
N/A Rvwd W-R
5625 51 Ave S  TrinSPIN Addition  **new civil plan submitted 9-4-15
**new plans submitted 08-27-15
**edited 8-27-15 (CR) Construct a new office building.  
P5625.8.6.15 9/4/2015  Approved
9/4/2015
Approved
9/8/2015
Approved
11/12/2015
N/A FND Issued
W-R
5625 51 Ave S  TrinSPIN Addition  **new plans submitted 08-27-15
**edited 8-27-15 (CR) Construct a new office building.  
P5625.8.6.15 8/27/2015  Pending
9/3/2015
Approved
8/27/2015
Pending
9/1/2015
N/A Superseded
5625 51 Ave S  TrinSPIN Addition  **edited 8-27-15 (CR) Construct a new office building.   P5625.8.6.15 8/6/2015  Pending
8/17/2015
Approved
8/10/2015
PendingN/A Superseded
3803 31 St N  MDC Maintenance Building  New maintenance building, foundation permit at this time.   P3803.09.04.15 9/4/2015  Pending
9/24/2015
Approved
9/8/2015
Approved
9/18/2015
N/A Rvwd W-R
3154 41 St S  32nd Office Park  Construct a new office building. Contractor looking for foundation only permit to get started.   P3154.08.26.15 8/26/2015  Approved
8/26/2015
Approved
8/27/2015
Approved
9/9/2015
N/A OK to Issue
FND only
W-SignOffs
2701 University Dr S  Casey's Convenience Store  **Resubmittal of documents requested by the plan reviewers. 8.19.15 JDS**
**Resubmittal of civil and strucural and other requested documents.. 7.16.15 JDS**
Demolish existing convenience store and construct new Convenience Store and Fueling island. 
p2701.5.15.15 8/19/2015  Approved
8/27/2015
Approved
8/20/2015
Approved
9/2/2015
Approved
9/4/2015
OK to ISSUE
2701 University Dr S  Casey's Convenience Store  **Resubmittal of civil and strucural and other requested documents.. 7.16.15 JDS**
Demolish existing convenience store and construct new Convenience Store and Fueling island. 
p2701.5.15.15 7/16/2015  Pending
7/23/2015
Approved
7/17/2015
Pending
7/27/2015
Approved
9/4/2015
Superseded
2701 University Dr S  Casey's Convenience Store  Demolish existing convenience store and construct new Convenience Store and Fueling island.  p2701.5.15.15 5/15/2015  Pending
6/10/2015
Approved
5/18/2015
Pending
5/22/2015
Approved
9/4/2015
Superseded
714 Main Ave   Goldammer Retail Space  Fit up space for a new retail store.   P714.08.03.15 8/3/2015  N/AN/APending
9/14/2015
N/A NEW
1301 Administrative Ave. N  NDSU Ceres Hall Masonry Restoration  Masonry repointing; removal of 2 existing exterior fire escape stairs; window and door infill.  P.1301.7.17.15 7/17/2015  N/AApproved
7/21/2015
N/AN/A OK to ISSUE
2745 Main Ave  Indian Triumph of Fargo Addition  Construct a 6,385 sf addition to existing building. Moderate remodeling will be done to the existing building including new offices and bathrooms.  P2745.7.16.15 7/16/2015  Approved
7/22/2015
Approved
7/17/2015
Pending
8/6/2015
N/A Rvwd W-R
1511 12 Ave N  NDSU Music Education Masonry Repair  Repair masonry lintels and tuck point the masonry facade.  P1511.6.25.15 6/25/2015  N/AN/AN/AN/A OK to ISSUE
711 University Dr. S  Fraser Hall Kitchen Hood Remodel  Install New Kitchen Hood  P.711.6.23.15 6/23/2015  N/AApproved
6/29/2015
N/APending NEW
2921 Seter Pkwy S  Urban Dental Health  **abandoned project letter sent 1-21-16 (CR)
**new plans submitted 06-17-15
**Resubmittal of landscaping plan L100 5.6.15 JDS**
** Resubmittal of documents reuqested 4.16.15 JDS**

New dental facility with full basement 
p2921.2.5.15 6/18/2015  Pending
6/22/2015
Approved
7/23/2015
Approved
7/10/2015
N/A Ready
W-SignOffs
2921 Seter Pkwy S  Urban Dental Health  **Resubmittal of landscaping plan L100 5.6.15 JDS**
** Resubmittal of documents reuqested 4.16.15 JDS**

New dental facility with full basement 
p2921.2.5.15 5/6/2015  Pending
5/7/2015
Approved
5/7/2015
Pending
5/12/2015
N/A Superseded
2921 Seter Pkwy S  Urban Dental Health  ** Resubmittal of documents reuqested 4.16.15 JDS**

New dental facility with full basement 
p2921.2.5.15 4/16/2015  Pending
4/16/2015
Approved
4/16/2015
Pending
4/28/2015
N/A Superseded
2921 Seter Pkwy S  Urban Dental Health  New dental facility with full basement  p2921.2.5.15 2/5/2015  Pending
2/9/2015
Approved
2/9/2015
Pending
2/24/2015
N/A Superseded
875 Oak St  Fargo Park District Maintenance Building  **sent a notice to Vic asking if this was going to move forward. 1-21-16 (CR)
Remove and replace the maintenance building.  
P875.06.16.15 6/16/2015  Pending
6/22/2015
Approved
6/17/2015
Approved
8/5/2015
N/A Ready
W-SignOffs
5070 Prosperity Way S  Aspens Townhomes Bldg 7  Construct a 4 unit townhome. Address will be 5070, 5072, 5074 and 5076 Prosperity Way S.  P5070.6.2.15 6/2/2015  Approved
8/10/2015
Approved
6/4/2015
Approved
7/31/2015
N/A Rvwd W-R
5050 Prosperity Way S  Aspens Townhomes Bldg 5  Construct a 4 unit townhome. Address will be 5050, 5052, 5054 and 5056 Prosperity Way S.  P5050.6.2.15 6/2/2015  Approved
8/10/2015
Approved
6/4/2015
Approved
7/31/2015
N/A Rvwd W-R
5040 Prosperity Way S  Aspens Townhomes Bldg 4  Construct a 2 unit twinhome. Address will be 5040 and 5044 Prosperity Way S.  P5040.6.2.15 6/2/2015  Approved
8/10/2015
Approved
6/4/2015
Approved
7/31/2015
N/A Rvwd W-R
5030 Prosperity Way S  Aspens Townhomes Bldg 3  Construct a 4 unit townhome. Address will be 5030, 5032, 5034 and 5036 Prosperity Way S.  P5030.6.2.15 6/2/2015  Approved
8/10/2015
Approved
6/4/2015
Approved
7/31/2015
N/A Rvwd W-R
5020 Prosperity Way S  Aspens Townhomes Bldg 2  Construct a 4 unit townhome. Address will be 5020, 5022, 5024 and 5026 Prosperity Way S.  P5020.6.2.15 6/2/2015  Approved
8/10/2015
Approved
6/4/2015
Approved
7/31/2015
N/A Rvwd W-R
4075 40 Ave S  Swanson Health Products  **Resubmittal of site plan with a new location for the shed 5.18.15 JDS**
**Resubmittal for new location of shed 5.11.15 JDS**
Construct a 16 x 20 storage shed for maintenance storage. Wood framed construction and it will be anchored to the parking lot. 
P4075.4.30.15 5/18/2015  Pending
5/19/2015
Approved
5/19/2015
Pending
5/27/2015
N/A Ready
W-SignOffs
4075 40 Ave S  Swanson Health Products  **Resubmittal for new location of shed 5.11.15 JDS**
Construct a 16 x 20 storage shed for maintenance storage. Wood framed construction and it will be anchored to the parking lot. 
P4075.4.30.15 5/11/2015  PendingPendingPendingN/A Superseded
4075 40 Ave S  Swanson Health Products  Construct a 16 x 20 storage shed for maintenance storage. Wood framed construction and it will be anchored to the parking lot.  P4075.4.30.15 4/30/2015  Rejected
5/5/2015
Approved
5/1/2015
PendingN/A Superseded
4230 14 Ave N  Standard / Alloway Industries  Create outdoor storage by installing fences around 2 areas that will be excavated and then 6" of crushed concrete will we put down.  P4230.4.28.15 4/28/2015  Approved
4/29/2015
Approved
4/29/2015
Pending
4/30/2015
N/A Ready
W-SignOffs
300 Main Ave  Jimmy Johns Drive-Thru   **new plan submitted 04-15-15
Remodel the parking lot to create a drive-thru for Jimmy Johns 
P300.3.23.15 4/15/2015  Approved
4/17/2015
Approved
4/16/2015
Approved
4/24/2015
N/A OK to ISSUE
300 Main Ave  Jimmy Johns Drive-Thru   Remodel the parking lot to create a drive-thru for Jimmy Johns  P300.3.23.15 3/23/2015  Approved
3/26/2015
Approved
3/25/2015
Pending
4/2/2015
N/A Superseded
3480 38 Ave S  Rabbit River Building 1  **sent abandoned project letter 1-21-16 Rogness asked for another 6 months(CR)
**New landscaping plan and New Civil drawings**
##Updated Landscape Plan## 2-6-15##
Construct a new 30 unit apartment building with associated garages.  
P3480.01.20.15 2/23/2015  Approved
2/25/2015
Approved
2/24/2015
Pending
3/11/2015
N/A Rvwd W-R
3480 38 Ave S  Rabbit River Building 1  ##Updated Landscape Plan## 2-6-15##
Construct a new 30 unit apartment building with associated garages.  
P3480.01.20.15 2/6/2015  PendingPending
2/9/2015
Pending
2/12/2015
N/A Superseded
3480 38 Ave S  Rabbit River Building 1  Construct a new 30 unit apartment building with associated garages.   P3480.01.20.15 1/20/2015  Pending
1/30/2015
Pending
1/21/2015
Pending
1/28/2015
N/A Superseded
3450 38 Ave S  Rabbit River Office  **abandoned project letter sent 1-21-16 Rogness asked for another 6 months (CR)
**New landscaping plan and New Civil drawings 2.23.15**
##Updated Landscape Plan## 2-6-15##
**new plans submitted 01-28-15
Construct a new office building with associated parking lot, only civil and FND plans submitted. 
P3450.01.20.15 2/23/2015  Approved
2/25/2015
Approved
2/24/2015
Fnd only
3/11/2015
N/A Rvwd W-R
3450 38 Ave S  Rabbit River Office  ##Updated Landscape Plan## 2-6-15##
**new plans submitted 01-28-15
Construct a new office building with associated parking lot 
P3450.01.20.15 2/6/2015  PendingPending
2/9/2015
Pending
2/12/2015
N/A Superseded