Plan Routing
Plans listed as rejected need to be amended / modified and submitted for further review.
Address
Project Title
Description
Project
Date
Eng.
Fire
Plan.
Hlth.
Insp.
2603 Kirsten Ln
Noodles & Co
Fit up existing space for new restaurant
P2603.05.17.13
5/17/2013
N/A N/A N/A Pending
Pending
4323 45 St S
Shoppes South at Osgood
**new plans submitted 05-17-13
Contractor is requesting foundation only at this time. Foundation Plans only for future construction of a multi tenant single story structure.
P4323.08.09.12
5/17/2013
Pending Pending Pending N/A
Pending
4323 45 St S
Shoppes South at Osgood
Contractor is requesting foundation only at this time. Foundation Plans only for future construction of a multi tenant single story structure.
P4323.08.09.12
8/9/2012
Approved
8/17/2012Approved
8/13/2012Pending
8/17/2012N/A
Approved
2512 7 Ave S
True Loyalty Tattoo
** new plan submitted 05-17-13
Fit up existing space for a new tatoo shop
P2512..04.04.13
5/17/2013
N/A N/A N/A
Approved
5/17/2013
Pending
2512 7 Ave S
True Loyalty Tattoo
Fit up existing space for a new tatoo shop
P2512..04.04.13
4/4/2013
N/A N/A N/A
Rejected
4/5/2013
Rejected
2633 55 St S
Galleria on Veterans
**new plans submitted 05-17-13
Construct a new strip mall. Contractor is requesting foundation only. New plans will be routed for the structure.
P2633.04.23.13
5/17/2013
Pending Pending Pending N/A
Pending
2633 55 St S
Galleria on Veterans
Construct a new strip mall. Contractor is requesting foundation only. New plans will be routed for the structure.
P2633.04.23.13
4/23/2013
Pending Approved
4/24/2013Pending
5/14/2013N/A
Pending
5301 27 St S
Crystal Creek Apt - Phase II
**new plans submitted 05-16-13
**new plan submitted 04-08-13
Three story, 78 unit apartment with underground parking along with detached garages.
p5301.2.7.13
5/16/2013
Pending Approved
5/17/2013Pending N/A
Pending
5301 27 St S
Crystal Creek Apt - Phase II
**new plan submitted 04-08-13
Three story, 78 unit apartment with underground parking along with detached garages.
p5301.2.7.13
4/15/2013
Pending
5/8/2013Approved
4/16/2013Approved
4/22/2013N/A
Pending
5301 27 St S
Crystal Creek Apt - Phase II
Three story, 78 unit apartment with underground parking along with detached garages.
p5301.2.7.13
2/7/2013
Pending
3/14/2013Pending Pending
3/18/2013N/A
Pending
3501 13 Ave S
Helenske Billboard
Install a 14'x48' digital billboard.
s3501.5.16.13
5/16/2013
N/A N/A Pending N/A
Pending
56 Broadway
52 Broadway LLC
Construct a new parking lot and patio
P56.05.15.13
5/15/2013
Pending Approved
5/16/2013Pending N/A
Pending
1358 39 St N
Johnson Brothers Northwest Beverages, Inc
Construct a warehouse addition
P1358.05.14.13
5/14/2013
Pending Pending Pending N/A
Pending
2515 University Dr S
Bottle Barn
**new site plan submitted 05-14-13
**new plan submitted 05-09-13
Demolish the existing restaurant and construct a new building with a liquor store on the east end and a leaseable space on the west.
P2515.04.16.13
5/14/2013
Approved
5/14/2013Approved
5/15/2013Approved
5/15/2013N/A
Pending
2515 University Dr S
Bottle Barn
**new plan submitted 05-09-13
Demolish the existing restaurant and construct a new building with a liquor store on the east end and a leaseable space on the west.
P2515.04.16.13
5/10/2013
Fdn only
5/10/2013Approved
5/13/2013Approved
5/13/2013N/A
Pending
2515 University Dr S
Bottle Barn
Demolish the existing restaurant and construct a new building with a liquor store on the east end and a leaseable space on the west.
P2515.04.16.13
4/16/2013
Pending Approved
4/18/2013Approved
5/2/2013N/A
Pending
620 28 St S
McLaughlin Family LLC
Updated plans 5-13-13 jm
Construct an addition to the existing building
P620.04.16.13
5/13/2013
Pending Approved
5/15/2013Approved
5/14/2013N/A
Pending
620 28 St S
McLaughlin Family LLC
Construct an addition to the existing building
P620.04.16.13
4/16/2013
Pending
5/8/2013Pending
4/18/2013Pending
5/1/2013N/A
Pending
345 27 Cir S
27th Street Circle Parking Area
New plans submitted 5/7/13
***36'x28' approach and 36'x15' parking area on east side of existing building.
p345.5.3.13
5/13/2013
Pending Approved
5/15/2013Approved
5/14/2013N/A
Pending
345 27 Cir S
27th Street Circle Parking Area
36'x28' approach and 36'x15' parking area on east side of existing building.
p345.5.3.13
5/3/2013
Pending Approved
5/7/2013Pending
5/7/2013N/A
Pending
2424 13 Ave S
Kebab King
Remodel lease space for a small restaurant
p2424.5.13.13
5/13/2013
N/A N/A N/A
Approved
5/16/2013
Pending
4300 23 Ave S
FM Curling Club
**new plan submitted 05-13-13
Construct a 125'x210' pre-engineered metal building.
p4300.5.1.13
5/13/2013
Approved
5/16/2013Approved
5/13/2013Approved
5/14/2013N/A
Pending
4300 23 Ave S
FM Curling Club
Construct a 125'x210' pre-engineered metal building.
p4300.5.1.13
5/2/2013
Pending Approved
5/9/2013Pending
5/10/2013N/A
Pending
4656 40 Ave S suite 200
Lil Bloomers Daycare
Remodel to provide an additional entry/exit and expand the outdoor play area.
P4656.05.13.13
5/13/2013
N/A N/A N/A
Approved
5/15/2013
Pending
7 10 St N
Craig Holdings, LLC
Install a new parking lot for future apartment building. (plans for apartment building have not been routed yet)
P7.13.13
5/13/2013
Pending Approved
5/13/2013Pending
5/15/2013N/A
Approved
6218 53 Ave S
Richards 3rd Subdivision Site Improvements
Parking lot.
Grade site to receive new concrete paving and add in retention ponds to accept storm water runoff.
P6218.05.10.13
5/10/2013
Pending Approved
5/14/2013Approved
5/17/2013N/A
Approved
4405 45 St S
Casey's General Store
**new plans submitted 05-10-13
Building plans submitted 5-3-13
***Updated Site Plan 5.2.13
***Construct a new convenience store with gasoline sales
P4405.03.20.13
5/10/2013
Approved
5/14/2013Approved
5/15/2013Approved
5/10/2013Pending
Pending
4405 45 St S
Casey's General Store
Building plans submitted 5-3-13
***Updated Site Plan 5.2.13
***Construct a new convenience store with gasoline sales
P4405.03.20.13
5/3/2013
Pending
5/7/2013Approved
5/8/2013Approved
5/6/2013
Approved
5/6/2013
Pending
4405 45 St S
Casey's General Store
Updated Sight Plan 5.2.13
Construct a new convenience store with gasoline sales
P4405.03.20.13
5/2/2013
Pending Approved
5/8/2013Approved
5/6/2013
Rejected
5/3/2013
Pending
4405 45 St S
Casey's General Store
Construct a new convenience store with gasoline sales
P4405.03.20.13
3/20/2013
Pending
5/1/2013Approved
3/25/2013Pending
4/3/2013
Rejected
3/27/2013
Pending
4611 Amber Valley Parkway
La Quinta Inn & Suites Addition
**new plan submitted 05-08-13
**new plans submitted 04-25-13
Add a 4 story 69 room addition to existing hotel.
p4611.3.7.12
5/8/2013
Approved
5/8/2013Approved
5/9/2013Approved
5/9/2013N/A
Pending
4611 Amber Valley Parkway
La Quinta Inn & Suites Addition
**new plans submitted 04-25-13
Add a 4 story 69 room addition to existing hotel.
p4611.3.7.12
4/25/2013
Pending Approved
4/26/2013Approved
5/9/2013N/A
Pending
4611 Amber Valley Parkway
La Quinta Inn & Suites Addition
Add a 4 story 69 room addition to existing hotel.
p4611.3.7.12
3/7/2013
Approved
3/19/2013Rejected
3/11/2013Pending
3/14/2013N/A
Pending
4707 45 St S
Freedom Community Credit Union
**new plans submitted 05-08-13
**new plan submitted 04-04-13
**new plan submitted 10-05-12
Construct a new credit union
P4707.09.27.12
5/8/2013
Pending Approved
5/10/2013Pending N/A
Pending
4707 45 St S
Freedom Community Credit Union
**new plan submitted 04-04-13
**new plan submitted 10-05-12
Construct a new credit union
P4707.09.27.12
4/4/2013
Pending Approved
4/5/2013Pending
4/26/2013N/A
Pending
4707 45 St S
Freedom Community Credit Union
**new plan submitted 10-05-12
Construct a new credit union
P4707.09.27.12
10/5/2012
Pending
10/23/2012Approved
10/9/2012Approved
10/9/2012N/A
Approved
4707 45 St S
Freedom Community Credit Union
Construct a new credit union
P4707.09.27.12
9/27/2012
Pending Pending Pending
10/3/2012N/A
Pending
5151 23 Ave S
Sanford Fargo Medical Center
##new update landscape plan 5-7-13
**new site plan submitted 03-21-13
**recieved deep foundation plans that went with the previous application entered on 3-06-13. Routed plans with the 3-06-13 application. 03-20-13 (CR)
Site Plan review of information in preparation for deep foundation package for building permit.
P5151.3.6.13
5/7/2013
Approved
5/14/2013Approved
5/16/2013Approved
5/9/2013N/A
Approved
5151 23 Ave S
Sanford Fargo Medical Center
**new site plan submitted 03-21-13
**recieved deep foundation plans that went with the previous application entered on 3-06-13. Routed plans with the 3-06-13 application. 03-20-13 (CR)
Site Plan review of information in preparation for deep foundation package for building permit.
P5151.3.6.13
3/21/2013
Approved
5/1/2013Approved
3/27/2013Approved
5/7/2013N/A
Pending
5151 23 Ave S
Sanford Fargo Medical Center
Site Plan review of information in preparation for deep foundation package for building permit.
P5151.3.6.13
3/6/2013
Pending Rejected
3/13/2013Pending N/A
Pending
5151 23 Ave S
Sanford Fargo Medical Center
Preliminary site grading package to develop temporary roads, laydown areas, parking areas and trailer complex location. No building permit is required for this work
P5151.08.29.12
8/29/2012
Approved
9/17/2012Approved
9/5/2012Approved
9/6/2012N/A
Approved
1401 33 St S
Cash Wise Liquor
Construct a new liquor store
P1401.05.07.13
5/7/2013
Pending Approved
5/10/2013Pending
Approved
5/13/2013
Pending
1709 25 Ave S
One Oak Place Phase III
Construct a new apartment with associated parking and garages. Contractor would like a permit for the foundaiton and will re submit building plans.
P1709.05.07.13
5/7/2013
Pending Approved
5/8/2013Pending
5/14/2013
Approved
5/17/2013
Pending
1652 44 St S
Home 2 Suites
Construct a 4 story hotel.
P1652.05.06.13
5/6/2013
Pending Approved
5/8/2013Approved
5/13/2013
Approved
5/17/2013
Pending
23 Broadway N
23 Broadway LLP
Convert the top 3 floors of this building into apartments. 6 per floor for a total of 18 units
p23.5.3.13
5/3/2013
N/A N/A Approved
5/9/2013N/A
Pending
4000 13 Ave S
Panera Bread
New plans submitted 5-3-13
***Construct a new Panera Bread store
P4000.03.27.13
5/3/2013
Approved
5/8/2013Approved
5/8/2013Approved
5/10/2013
Approved
5/6/2013
Approved
4000 13 Ave S
Panera Bread
Construct a new Panera Bread store
P4000.03.27.13
3/27/2013
Approved
4/15/2013Approved
3/28/2013Approved
4/29/2013
Approved
3/27/2013
Pending
1430 Administration Avenue
Panda Express
Interior remodel of an existing food court space for new tenant.
p1340.5.3.13
5/3/2013
N/A N/A N/A
Approved
5/6/2013
Pending
3640 42 St S
BMI 42nd St Apartments 2nd
* New site plan submitted 5.3.13-bt *
Second of four 36-unit apartment buildings.
p3640.4.29.13
5/3/2013
Pending Approved
5/6/2013Pending
5/9/2013N/A
Pending
3640 42 St S
BMI 42nd St Apartments 2nd
Second of four 36-unit apartment buildings.
p3640.4.29.13
4/29/2013
Pending Rejected
5/6/2013Pending N/A
Pending
3620 42 St S
BMI 42nd St Apartments 1st
* New site plan submitted 5.3.13-bt *
First of four 36-plex apartment buildings.
p3620.4.29.13
5/3/2013
Pending Approved
5/6/2013Pending N/A
Pending
3620 42 St S
BMI 42nd St Apartments 1st
First of four 36-plex apartment buildings.
p3620.4.29.13
4/29/2013
Pending Rejected
5/6/2013Pending N/A
Pending
3660 42 St S
BMI 42nd St Apartments 3rd
* New site plan submitted 5.3.13-bt *
Third of four 36-unit apartment buildings.
p3660.4.29.13
5/3/2013
Pending Approved
5/6/2013Pending N/A
Pending
3660 42 St S
BMI 42nd St Apartments 3rd
Third of four 36-unit apartment buildings.
p3660.4.29.13
4/29/2013
Pending Rejected
5/6/2013Pending N/A
Pending
3680 42 St S
BMI 42nd St Apartments 4th
* New site plan submitted 5.3.13-bt *
Fourth of four 36-unit apartment buildings
p3680.4.29.13
5/3/2013
Pending Approved
5/6/2013Pending N/A
Pending
3680 42 St S
BMI 42nd St Apartments 4th
Fourth of four 36-unit apartment buildings
p3680.4.29.13
4/29/2013
Pending Rejected
5/6/2013Pending N/A
Pending
3301 23 Ave S
Fargo Baptist Church
New landscaping/site plans submitted 4/30/13
***Construct a new apartment building for students attending masters baptist college
P3301.03.15.13
5/1/2013
Approved
5/8/2013Approved
5/2/2013Approved
5/6/2013N/A
Pending
3301 23 Ave S
Fargo Baptist Church
Construct a new apartment building for students attending masters baptist college
P3301.03.15.13
3/15/2013
Approved
4/15/2013Approved
3/18/2013Pending
3/19/2013N/A
Pending
3803 13 Ave S
Holiday Inn The Coffee House
Renovate existing gift shop into coffee shop
p3803.4.30.13
4/30/2013
N/A N/A N/A
Approved
5/1/2013
Approved
1805 NDSU Research Park Dr N
NDSU R2 Server Room Cooling
Add cooling equipment for server room, including chiller, piping, and interior finishes.
p1805.4.29.13
4/29/2013
N/A N/A N/A N/A
Approved
1230 40 St N
TRS Industries Addition
36,000 SF addition with mezzanine to existing, pre-engineered metal building.
p1230.4.29.13
4/29/2013
Pending Approved
5/2/2013Approved
5/14/2013N/A
Pending
1401 Administration Ave
NDSU Memorial Union Food Court
Remodel existing food court area.
P1401.04.25.13
4/25/2013
N/A N/A N/A
Approved
4/29/2013
Pending
5302 51 Ave S
Brookstone Property Headquarters
**new plans submitted 04-15-13
**new plans submitted 12-04-12
**new plans submitted 11-9-12
single story 12,000 SF office and industrial building
p5302.10.30.12
4/15/2013
Approved
4/23/2013Approved
4/18/2013Approved
5/3/2013N/A
Approved
5302 51 Ave S
Brookstone Property Headquarters
**new plans submitted 12-04-12
**new plans submitted 11-9-12
single story 12,000 SF office and industrial building
p5302.10.30.12
12/5/2012
Approved
12/7/2012Approved
12/6/2012Approved
12/10/2012N/A
Approved
5302 51 Ave S
Brookstone Property Headquarters
**new plans submitted 11-9-12
single story 12,000 SF office and industrial building
p5302.10.30.12
11/13/2012
Approved
12/5/2012Approved
11/13/2012Approved
11/16/2012N/A
Pending
1351 Broadway N
Rosewood on Broadway
**new plan submitted 04-15.13
**new plan submitted 04-12-13
Demolish the existing chapel space and build a new larger chapel. Expand the existing parking lot. Demolish the existing buildings on the acquired property.
P1351.03.19.13
4/15/2013
Pending Approved
4/18/2013Approved
5/1/2013N/A
Pending
1351 Broadway N
Rosewood on Broadway
**new plan submitted 04-12-13
Demolish the existing chapel space and build a new larger chapel. Expand the existing parking lot. Demolish the existing buildings on the acquired property.
P1351.03.19.13
4/12/2013
Pending Approved
4/18/2013Pending N/A
Pending
1351 Broadway N
Rosewood on Broadway
Demolish the existing chapel space and build a new larger chapel. Expand the existing parking lot. Demolish the existing buildings on the acquired property.
P1351.03.19.13
3/19/2013
Pending Approved
3/26/2013Pending
4/9/2013N/A
Pending
3950 37 Ave S
Kost Materials Plant Enclosure
Construct a building around the existing concrete plant for office and warehouse use.
P3950.04.11.13
4/11/2013
Fdn only
4/25/2013Approved
4/26/2013Approved
4/23/2013N/A
Pending
4901 45 St S
McDonalds
Construct a new McDonalds restaurant
P4901.04.10.13
4/10/2013
Pending Approved
4/18/2013Pending
Approved
5/16/2013
Pending
3234 43 St S
Fargo Billiards
Construct new volleyball courts, picnic area and serving building
P3234.04.10.13
4/10/2013
Approved
4/11/2013Approved
4/11/2013Pending
4/25/2013
Approved
4/10/2013
Approved
1523 12 Ave N
NDSU Auxiliary Enterprises
Interior demolition and remodel of office space and a lab including mechanical and electrical
P1523.04.04.13
4/4/2013
N/A N/A N/A N/A
Approved
4681
Cascades 4
**new site plan submitted 04-02-13
**New site plan submitted 10-10-12
Construct a new apartment building
P4677.09.24.12
4/2/2013
Fdn only
5/1/2013Approved
4/3/2013Approved
4/29/2013N/A
Pending
4681
Cascades 4
**New site plan submitted 10-10-12
Construct a new apartment building
P4677.09.24.12
10/10/2012
Approved
10/23/2012Rejected
10/16/2012Pending
10/15/2012N/A
Pending
4681
Cascades 4
Construct a new apartment building
P4677.09.24.12
9/24/2012
Pending
9/25/2012Pending
9/25/2012Pending
10/1/2012N/A
Pending
2560 55 ST S
Amber Point Apartment Building 4
Construct a new apartment building with associated garages
P2560.03.28.13
3/28/2013
Approved
4/16/2013Approved
3/28/2013Approved
4/19/2013N/A
Pending
2520 55 St S
Amber Pointe Apartment Building 3
Construct a new apartment building with associated garages
P2520.03.28.13
3/28/2013
Approved
4/16/2013Approved
3/28/2013Approved
4/19/2013N/A
Pending
3202 Broadway N
Weston Apartment
Construct a new 24 unit apartment building with associated garages. Demolishion of existing building included in project.
P3202.03.26.13
3/26/2013
Approved
3/28/2013Approved
3/27/2013Approved
4/4/2013N/A
Pending
4215 13 Ave S
Red Lobster
Refinish exterior and interior of restaurant. New fixtures, furniture and finishes. Kitchen and lounge equipment to remain unchanged.
p4215.2.25.13
3/25/2013
N/A N/A N/A
Approved
4/2/2013
Approved
121 23 St S
Unterseher Building
Updated plans for a residential building.
Construct a 32 x 78 - 2 story building
P121.01.22.13
3/7/2013
Approved
3/8/2013Approved
3/8/2013Pending
3/8/2013N/A
Pending
121 23 St S
Unterseher Building
Construct a 32 x 78 - 2 story building
P121.01.22.13
1/22/2013
Pending
2/26/2013Approved
1/24/2013Pending
2/4/2013N/A
Pending
1304 13 Ave S
Children of Hope Childcare
Change the occupancy of the existing building to a daycare.
P1304.03.05.13
3/5/2013
N/A N/A Approved
3/14/2013
Approved
3/14/2013
Pending
2012 Great Northern Drive
Smith Tire and Tread
Install goodyear retread plan in existing building.
P2012.03.01.13
3/1/2013
N/A Pending
3/5/2013N/A N/A
Pending
2727 13 Ave S
Don's Car Wash Billboard
Install 10'x30' EMC billboard.
s2727.2.25.13
2/25/2013
N/A N/A Pending N/A
Pending
3401 33 St S
Butler Fargo Parking Lot
Add to the existing parking lot
P3401.02.22.13
2/22/2013
Approved
2/26/2013Approved
2/26/2013Approved
3/13/2013N/A
Approved
4831 13 Ave S
Sams Club Remodel
Interior and exterior remodel to existing store.
P4831.02.22.13
2/22/2013
N/A N/A N/A
Approved
3/27/2013
Approved
1621 45 St S
Happy Harry's Billboard
Install 10'x30' digital billboard oriented to 17th Avenue South.
s1621.2.15.13
2/15/2013
N/A N/A Pending N/A
Pending
1420 40 Ave N
Healthcare Environmental Services Inc
Construct a new laundry building including site work and existing building demolition.
P1420.02.12.13
2/12/2013
Pending
3/25/2013Approved
2/14/2013Pending
3/18/2013N/A
Pending
4609 33 Ave S
EMC Billboard 4609
Install 30'x10' EMC billboard on north side of lot.
s4609.2.1.13
2/1/2013
N/A N/A Rejected
2/6/2013N/A
Rejected
5503 33 Ave S
EMC Billboard 5503
Install 30'x10' EMC billboard on north end of lot
s5503.2.1.13
2/1/2013
N/A N/A Rejected
2/6/2013N/A
Rejected
3931 9 Ave S
Marcus Cinema Remodeling
Interior remodeling of exiting lobby including redecorating of the facility and new concession area. Relocate the box office. Work will include some exterior finishes.
P3931.01.15.13
1/15/2013
N/A N/A N/A
Approved
1/22/2013
Pending
1510 12 Ave N
NDSU Parking Lot Improvements (T Lot)
pave and re pave portions of the T lot parking area.
P1510.11.27.12
11/27/2012
Approved
12/5/2012Approved
11/29/2012Approved
12/6/2012N/A
Approved
2632 2640 47 St S The Offices at Urban Plains Building B
Construct a new office building
P2632.10.23.12
10/23/2012
Approved
11/1/2012Approved
10/24/2012Fdn only
11/8/2012N/A
Pending
3362 35 Ave S
Titan Machinery Parking
Expand equipment and material storage parking lot. Intended to be crush rock material.
p3362.10.18.12
10/18/2012
Approved
10/23/2012Approved
10/19/2012Approved
10/18/2012N/A
Approved
201 University Dr S
Bethany Addition and Remodel
Addition and remodel of the existing facility.
To be re-bid spring of 2013
P201.09.10.12
9/10/2012
Approved
9/17/2012Approved
9/10/2012Approved
9/14/2012N/A
Pending
1150 36 St S
Acapulco Interior Remodel
Interior remodel/ future bar add exit to patio.
P1150.09.07.12
9/7/2012
N/A N/A N/A
Approved
9/18/2012
Approved
4095 34 Ave S
34th Avenue Apartments #3
**new plan submitted 09-06-12
Construct a new 36 unit apartment building with associated garages
P4095.08.10.12
9/6/2012
Approved
9/10/2012Approved
9/10/2012Approved
9/18/2012N/A
Approved
4083 34 Ave S
34th Avenue Apartments #2
**new plan submitted 09-06-12
Construct a 36 unit apartment building with associated garages
P4083.08.10.12
9/6/2012
Approved
9/10/2012Approved
9/10/2012Approved
9/18/2012N/A
Approved
5220 50 Ave S
Lynn Grove Commercial Center
Construct 6 buildings for general storage and warehouse use.
P5220.08.16.12
8/16/2012
Approved
8/17/2012Approved
8/16/2012Approved
10/25/2012N/A
Pending
2500 Broadway N
Northport Hornbachers Parking Lot
Demolish and reconstruct parking lot, including storm sewer, stormwater retention, lighting, & paving.
p2500.7.27.12
7/27/2012
Pending
8/17/2012Approved
8/1/2012Approved
8/7/2012N/A
Approved